Laserfiche WebLink
Water Supply Reserve Account-Grant Application Form <br /> Form Revised March 2009 <br /> Specifications were provided to the company contact. Reference: the attached <br /> NRCS Structure for Water Control design <br /> TASK 3-Project Construction and Installation (COMPLETED) <br /> Description of Task-The planned Structure for Water Control shall be installed <br /> Method/Procedure-On site: Contractor(NRCS staff and contact person when needed) <br /> ✓ the structure shall be constructed/installed <br /> ✓ the site shall be smoothed and reseeded <br /> Deliverable-A completed and functioning Structure for Water Control <br /> REPORTING AND FINAL DELIVERABLE <br /> Reporting: The applicant shall provide the CWCB a progress report every 6 months, beginning from the <br /> date of the executed contract. The progress report shall describe the completion or partial completion of <br /> the tasks identified in the statement of work including a description of any major issues that have <br /> occurred and any corrective action taken to address these issues. <br /> Final Deliverable: At completion of the project, the applicant shall provide the CWCB a final report <br /> that summarizes the project and documents how the project was completed. This report may contain <br /> photographs, summaries of meetings and engineering reports/designs. <br /> V Afnal report will be provided to the CWCB after the construction and installation of <br /> the project is completed. <br /> Practice is complete and meets NRCS's standards and specifications for Structure For Water Control <br /> #587. The Final Inspection Report is attached. <br /> cite,144-1,4-1 <br /> ivees .1/136 _641s <br /> 11 <br />