My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
North Platte - Seneca Ditch Water Structure_Final Report
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
North Platte - Seneca Ditch Water Structure_Final Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2014 4:21:45 PM
Creation date
6/17/2013 4:19:53 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
North Platte
Applicant
Loban, Hackleman, Olson LLC.
Description
Seneca Ditch - Structure for Water Control
Account Source
Basin
Board Meeting Date
7/18/2012
Contract/PO #
13IBC000011
WSRA - Doc Type
Final Deliverable Documents
Document Relationships
North Platte - Seneca Ditch Water Structure_Applic
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\METRO - SOUTH PLATTE
North Platte - Seneca Ditch Water Structure_BRTLtr
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\METRO - SOUTH PLATTE
North Platte - Seneca Ditch Water Structure_NoticeToProceed
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\METRO - SOUTH PLATTE
North Platte - Seneca Ditch Water Structure_Purchase Order
(Message)
Path:
\WSRF Grant & Loan Information\DayForward\METRO - SOUTH PLATTE
North Platte - Seneca Ditch Water Structure_Purchase Order
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\METRO - SOUTH PLATTE
North Platte - Seneca Ditch Water Structure_Summary Sheet
(Attachment)
Path:
\WSRF Grant & Loan Information\DayForward\METRO - SOUTH PLATTE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account—Grant Application Form <br /> Form Revised March 2009 <br /> BUDGET <br /> * Total Costs <br /> * <br /> Labor/Equipment/Materials Cost <br /> Task 1—Need and Feasibility NRCS staff: In-Kind Contribution <br /> Project Contact Person: In-Kind 300.00 <br /> Contribution <br /> Task 2—Survey and Design NRCS staff: In-Kind Contribution 2,200.00 <br /> Contractor: Concrete <br /> Task 3—Construction and Riprap 63,300.00 <br /> Installation Bar Grates(cat walk) <br /> Gates <br /> Administration Costs Copies,Billing, Reports and Etc. 633.00 <br /> (1% of monetary cost of structure) <br /> Total Costs: 66,433.00 <br /> Contributions <br /> Planned Actual <br /> NRCS(In-Kind Contribution): 2,500.00 2,500.00 <br /> Applicant/Water Owners Contribution(10% of monetary contribution): 6,393.30 5,367.79 <br /> WRSA Contribution: 57,539.70 48,301.14 <br /> Total Contributions: 66,433.00 56,168.93 <br /> * The Applicant/Landowner shall be responsible for any and all cost over-rides. <br /> * If the final project completion cost is less than the requested WRSA funds,the remaining funds will be returned to the <br /> Basin Account. <br /> 12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.