Laserfiche WebLink
Water Supply Reserve Account—Grant Application Form <br /> Form Revised March 2009 <br /> structure. NRCS will continue to provide technical support throughout the construction,installation, <br /> revegetation, and maintenance phases of the project. <br /> The entire amount of the WSRA funds requested will be used in the actual construction,installation and <br /> administration of the new structure. <br /> OBJECTIVES: <br /> 1. To install a Structure for Water Control (headgate) that will efficiently and effectively <br /> control the amount of water entering into the Seneca Ditch, provide a positive shutoff at <br /> the structure location. <br /> 2. To provide the water users and commissioner with a better means of controlling and <br /> administering the water rights and flows associated with the Seneca Ditch. <br /> TASKS: <br /> TASK 1 —Determination of Project Need and Feasibility (COMPLETED) <br /> Description of Task—Determine the need and feasibility of installing a new Structure for <br /> Water Control in the Seneca Ditch <br /> Method/Procedure—Site visit: Seneca Ditch representative and NRCS personnel <br /> ✓ Assess the current condition of the existing structure and consider <br /> the need, feasibility and cost of installing a new structure. <br /> Deliverable—Project was determined to be needed and feasible <br /> TASK 2—Engineering Survey and Design (COMPLETED) <br /> Description of Task - Perform the on-site engineering survey and design a Structure for <br /> Water Control. <br /> Method/Procedure - Follow-up visit: NRCS staff <br /> V an engineering survey will be performed <br /> Deliverable—An engineering plan, draft structure design and copies of NRCS's Standards and <br /> 10 <br />