Laserfiche WebLink
Deliverable <br /> Signed and dated paper and electronic copies of As-Built drawings prepared by engineer <br /> of record on 11"x 17"sheet size. <br /> REPORTING AND FINAL DELIVERABLE <br /> Reporting: The applicant shall provide the CWCB a progress report every 6 months, beginning <br /> from the date of the executed contract. The progress report shall describe the completion or <br /> partial completion of the tasks identified in the statement of work including a description of any <br /> major issues that have occurred and any corrective action taken to address these issues. <br /> Final Deliverable: At completion of the project, the applicant shall provide the CWCB a final <br /> report that summarizes the project and documents how the project was completed. This report <br /> may contain photographs, summaries of meetings and engineering reports/designs. <br /> BUDGET <br /> The total project cost is estimated to be $362,690 and will be funded by a $161,345 WSRA grant, <br /> $161,345 CWCB loan and $40,000 applicant contribution. The CWCB disbursement of loan and <br /> WSRA grant funds will be issued at a ratio of 1:1, up to the approved limit, for design and <br /> construction activities related to the Project. <br /> Table 1: Project Budget <br /> Task Project Costs <br /> Task 1—Outlet Works Rehabilitation $362,690_ <br /> 1.1 Engineering Design $68,715 <br /> 1.2 Bidding and Procurement $10,000 <br /> 1.3 Mobilization/Demobilization $50,000 <br /> 1.4 Construction $163,975 <br /> 1.5 Construction Management $60,000 <br /> 1.6 Record Drawings and Completion Report $10,000 <br /> Total Project Costs: $362,690 <br /> Less CWCB Loan Funding: -$161,345 <br /> Less Borrower Contribution: -$40,000 <br /> WSRA Grant Funding $161,345 <br /> 2 <br />