My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150354 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150354 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/3/2014 4:01:36 PM
Creation date
5/9/2013 9:54:00 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150354
CT2015-061
Contractor Name
Grand Mesa Water Conservancy District
Contract Type
Loan
Water District
40
County
Delta
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
58
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
D. GMWCD WATER RIGHTS <br />In 1961 the Grand Mesa Water Conservancy District (GMWCD) and the <br />North Fork Water Conservancy District filed with the Colorado Division of Water <br />Resources a plan known as the Grand Mesa Project to impound approximately <br />60,000 acre -feet of water on the South side of Grand Mesa. Over the intervening <br />years a series of studies was commissioned by GMWCD to determine the best <br />means of storing the snow pack accumulated on Grand Mesa. Two of these <br />studies focused on single large reservoirs, but the GMWCD determined that the <br />cost of developing storage in the range of 10,000 AF and above is very high and <br />out of reach of the District. Consequently, water from the Grand Mesa Project <br />has been transferred to smaller rehabilitated reservoirs: <br />A. Case 02CW009 transferred 93AF to Skinned Horse Reservoir <br />owned by, and rehabilitated by, GMWCD. <br />B. Case 01 CW23 transferred 97AF to Arch Slough Reservoir <br />owned by, and rehabilitated by, GMWCD. <br />C. Case 01 CW23 transferred 376AF to Upper Eggleston Reservoir <br />owned by, and rehabilitated by, GMWCD. <br />D. Case 09CW170 transfers 30 AF to Peak Reservoir now under <br />construction by GMWCD. <br />E. Case in progress requests transfer of 125 AF to Blanche <br />Park Reservoir, which is the topic of this application. <br />There has been no serious opposition to these filings, and because Delta <br />County residents favor additional water storage, the District does not anticipate <br />any protest to impound conditionally decreed water on Grand Mesa. <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.