My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150063 Misc Documents
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C150063 Misc Documents
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2015 9:34:18 AM
Creation date
4/29/2013 12:16:03 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150063
Contractor Name
Jackson Lake Reservoir & Irrigation Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SB 94-29
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0 <br />Agenda Item 90 <br />November 9, 1993 <br />Page two <br />• <br />as they become financially able to handle increased loan payments and cost share. <br />Plans and specifications for the project will require acceptance by the State <br />Engineer's Office. <br />ST F RECOMMENDATION <br />The staff recommends: <br />1. THAT A CONSTRUCTION FUND LOAN IN AMOUNT OF $1.0 MILLION <br />(4%, 30 YEARS) BE APPROVED FOR THE JACKSON LAKE RESERVOIR <br />AND IRRIGATION COMPANY, FOR THE REHABILITATION OF THE <br />UPSTREAM FACE OF THE JACKSON LAKE DAM, and <br />2. THAT THIS LOAN BE CONTINGENT UPON REVIEW OF THE <br />COMPANY'S FINANCIAL CONDITION AND ABILITY TO PAY, and <br />3. THAT THIS LOAN BE CONTINGENT UPON ACCEPTANCE OF THE <br />PLANS AND SPECIFICATIONS BY THE OFFICE OF THE STATE ENGINEER. <br />pX-011 Colm <br />On November 9, 1993 the CWCB Board took the following action, which was the <br />same as the staff recommendation: <br />1. Approved A CONSTRUCTION FUND LOAN IN AMOUNT OF $1.0 MILLION <br />(4%, 30 YEARS ) not to exceed 75% of actual construction and related costs FOR <br />THE JACKSON LAKE RESERVOIR AND IRRIGATION COMPANY, FOR THE <br />REHABILITATION OF THE UPSTREAM FACE OF THE JACKSON LAKE <br />DAM, and <br />2. Required THAT THIS LOAN BE CONTINGENT UPON REVIEW OF THE <br />COMPANY'S FINANCIAL CONDITION AND ABILITY TO PAY, and <br />3. Required THAT THIS LOAN BE CONTINGENT UPON ACCEPTANCE OF <br />THE PLANS AND SPECIFICATIONS BY THE OFFICE OF THE STATE <br />ENGINEER. <br />Attachments <br />Q \wp51 \9o119.cwc <br />
The URL can be used to link to this page
Your browser does not support the video tag.