Laserfiche WebLink
PCC Meeting — July 08, 2010 <br />9 <br />Version: August 30, 2010 <br />i. Previous report - $17,729,926 <br />e. No modifications issued since last PCC meeting <br />i. CCE transfers <br />(a). None <br />ii. Change order modifications <br />(a). None <br />iii. Total value of modifications - $632,246 <br />(a). CCE transfers - $33,283 <br />(b). Change orders - $598,963 <br />f. No undefinitized modifications pending finalization <br />g. No Requests for Proposal pending <br />h. Comparison of CCE to Contract Amount <br />i. All aforementioned modification qty hstd:_ <br />ii. Current contract value - $18,182,245 <br />iii. Current contingency - $1,49f5 <br />iv. Field Cost current - $19,681,760 <br />i. Ridges Basin Inlet Conduit- xs L00 0 complete overall <br />j. It was noted that the only remaining it e for the RBIC i <br />of the cathodic protection testing teport. <br />Upper County Road 21,1 Reconstruction x#8216) <br />a. Time elapsed - 93o- <br />i. Previous reports4�;.: <br />b. Percent complete - 941/° <br />i. Previous report - <br />c. Earn gs to d_ate - $14,96-3,308 <br />i PrevtoUS t'eport - $14,%963,308 <br />d. Cunt net contract value -$ 10,523,131 <br />i ALP $14,,30,214 <br />ii Bo x� k� y.2 W7 (non - federal funding) <br />iii Prevtbeport - $15,143,173 <br />e. Curtmt contri completion date <br />i .T*� 09, 2016"_ CR211 <br />it. Sept*mber 30, 2010 - Boat Ramp Access <br />f, Five m0i. ifications issued since last PCC meeting <br />CC`s transfers <br />None <br />Change order modifications <br />(a). #14 - Weather station installation - $1,955 <br />1. To install a weather station at the control house <br />(b). #15 - Outfall basin riprap repairs - est. $21,600 <br />1. Scour and loss of riprap around the RBIC energy <br />dissipation structure. <br />(c). #16 - Boat ramp access road - $1,380,000 <br />1. Non - federal, to construct the road and parking area, <br />including some design work on the parking area (mod to <br />come for those changes. <br />receipt <br />