My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCC Meeting 7/8/10 Notes
CWCB
>
ALP Project
>
PCC Meeting 7/8/10 Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/16/2013 1:00:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />PCC Meeting —July 08, 2010 <br />Version: August 30, 2010 <br />(d). #17 - Definitize mod #10 Tri-State approaches - ($8,159) <br />1. This definitizes the unilateral issued to construct Tri- <br />States' approaches. Net credit. <br />(e). #18 -Revisions to guardrail installation- ($15,437) <br />1. Needed to accommodate the utility accesses from the <br />new road. This resulted in the elimination of roughly <br />800' of rail, but added end sections at all of the Tri-State <br />approaches. <br />iii. Total value of modifications - $1,685,309 <br />(a). CCE transfers - $0 <br />(b). Change orders - $1,685,309 <br />g. One undefinitized modifications pendin-4. finalization (#15) <br />h. One Requests for Proposal pending <br />(a). Redesign of the guardrail - reed <br />(b). Additional stockpile of 9-pia-p <br />(c). Upcoming - Turnaround at boat ramp road <br />(d). Upcoming - Appro��hes for Tribute Garden <br />10 <br />(e). Upcoming - Design changes af-b6oat ramp parking area <br />i. Comparison of CCE to Contract Amoimt <br />i Current contract value - $16,5231-31 <br />ii. Current contingft <br />$3,649,951 <br />iii. Field Cost current $20.173,081 <br />10. NNMP -Fruitland Reach ",(#8A:,1.. <br />a. Attendees were reminded th Ott is <br />"'h-" work; <br /> -encompasses the installation <br />f <br />0 <br />,ate y seven miles of 24" <br />pipe. <br />b. It adde that this was designed many years ago, and since then <br />th0mr, have W`n house builtj,septic systems, and similar construction <br />that n i ith the.on <br />11 n�� , ginal alignment. This has a potential to <br />T-i1, <br />C. <br />q elapsed 96% <br />i. VvIous, <br />rt <br />75% <br />d. PercdJdt!,JcompleW` 82% <br />i. Pre ous report - 73% <br />*t <br />Earni4 '-to date - $7,687,302 <br />, <br />J Pr ovious report - $6,731,028 <br />f brit net contract value - $9,325,845 <br />i. N` Previous report - $9,283,845 <br />g. NTP issued December 15, 2008 <br />h. Contract completion is June 18, 2010 <br />i. One modification issued since last PCC meeting <br />i. CCE Transfers <br />(a). None <br />ii. Change orders modifications <br />(a). #07 - Existing 48" CMP irrigation pipe - $42,000 <br />1. NECA ran into an unexpected culvert during pipe laying <br />operations. They had to change the alignment of the <br />
The URL can be used to link to this page
Your browser does not support the video tag.