My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCC Meeting 7/8/10 Notes
CWCB
>
ALP Project
>
PCC Meeting 7/8/10 Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/16/2013 1:00:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — July 08, 2010 <br />Version: August 30, 2010 <br />(f). #105 -Delete Telephone System and 1/0 Cabinet— ($51,866) <br />1. The original system became obsolete, so it was deleted <br />from the contract. The security /communications <br />contract picked up this scope. <br />(g). #106 - Air Compressor Relocation — $44,485 <br />1. Both compressors were originally designed to be located <br />in vaults. This caused air intake and overheating issues, <br />so they were relocated to external above ground <br />locations. <br />(h). #107 - Control Cable and Elev Room Receptacle — $10,886 <br />1. A power receptacle was needed rrl 'h; elevator room, but <br />was not in the original desigq,° "This mod covered the <br />installation of the recept c-1 and t e conductor (into an <br />existing conduit). <br />(i). #108 - SUSG Fuel Escalalim ($16,740, , <br />1. This is due to the portable batch plant at P. Net <br />credit definitizos;mods #21• and #66 wheel wee for <br />SUSG fuel escalation. <br />iii. Total value of modifications t4 date — $4,693,371 <br />(a). CCE transfers — $447,622 <br />(b). Change ordeis - $4,245,749 <br />f Thirteen undefimthzed iiiWifications pending finalization <br />i. #21, #78, #83, and #87'wt; " defnitized' since last update <br />g. Several Requests for Proposal pennE,: <br />ii• ° ` HDPh bypass <br />i t "I arious IVAC revisions <br />iv Iil up dQQr at engine generator room <br />. <br />v e ocatlan of air compressors at air chambers <br />0'4, , This "W" was received <br />h. Comparison oi`E to Contract Amount <br />i. AIl` mentioned modification are listed <br />ii. Cuft nt contract value — $56,247,736 <br />Current contingency - $2,374,187 <br />x rTield Cost current - $58,621,923 <br />i 04rango Pumping Plant is 99% complete overall <br />i Previously reported 99% <br />8. Ridges Basin Inlet Conduit ( #8137) <br />a. Time elapsed —100% <br />i. Previous report — 100% <br />b. Percent complete — 100% <br />i. Previous report — 100% <br />c. Earnings to date — $18,150,265 <br />i. Previous report — $17,723,534 <br />d. Current net contract value - $18,182,246 <br />
The URL can be used to link to this page
Your browser does not support the video tag.