PCC Meeting — July 08, 2010 <br />Version: August 30, 2010 <br />(b). Current contingency - $2,661,668 <br />(c). Field Cost current - $96,180,585 <br />f. Ridges Basin dam is 99% overall complete <br />i. Previously showed 99% complete <br />6. Durango Pumping Plant, Stage I ( #8008) <br />a. Percent complete — 95% <br />b. No modifications since last update <br />c. One undefinitized modification pending finalization <br />d. Two RFPs pending <br />P, Cmm1naricnn of I-CP *n nnnh -ten+ ow,nā€žr,4 <br />VA <br />(e) <br />:nts, <br />,920 <br />d the <br />5 <br />be <br />ods of <br />1. Revisions to conduit layouts in drawings and for the <br />associated submittals, because of the design changes that <br />Reclamation made to the electrical systems throughout <br />the entire contract. <br />#104 - Definitize Mods 078 and 083, Flow Meter — $4,290 <br />1. These are the mechanical seal flowmeters. It was <br />decided that a meter was needed at every one of the <br />mechanical seals, which was not a part of the original <br />scope of work <br />