My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCC Meeting 7/8/10 Notes
CWCB
>
ALP Project
>
PCC Meeting 7/8/10 Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/16/2013 1:00:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — July 08, 2010 <br />Version: August 30, 2010 <br />normal operating conditions. The use of air as a medium to operate the <br />Obermeyer Gates will not work. A temporary system utilizing water as <br />the operating medium has been installed for operations this season. Other <br />alternative hoisting systems for the gate leafs are being evaluated. <br />4. The installation of a trash rake system is being evaluated for the intake <br />structure. Preliminary results are expected in August. <br />5. It appears that the Solids Exclusion Bushings on pumps 5 through 8 were <br />not installed in the factory. The pump manufacturer is preparing a <br />proposed remedy. <br />6. No change in risk rating <br />E. Unknown ground conditions <br />1. The contractor for the Horizontal Direction Drilling contract has <br />encountered conditions that they believe are dilpring site condition. <br />Work was delayed for one month while plans wer&%Mulated. A trench <br />was excavated through the sands and,, Vels above the bedrock to expose <br />the point where the drill hole exits hie bedrock. One largysndstone <br />boulder was encountered. No agreement owif this one bou dur represents <br />a differing site condition. Proposal totalm.3 million haviy'been <br />submitted for claimed impacts due to tli issue. Installation of the HDD <br />pipe has been satisfactorily completed. ' `�le.potential differing site <br />condition claim has be6iftesolved. <br />2. The risk rating was reviQ fti,Jqdicate an unch"'" level of risk. <br />F. Cultural resources mitigation <br />1. The final field season has Been completed Some minor field work for <br />clearance of 0ie boundary fencing remautbY to be completed. NAGPRA <br />related burials ltae been completed and documentation of project findings <br />is org0t�g. <br />2. No chance in ri"na <br />L" <br />H. <br />I. <br />Keeeittl ;.wards hake occurred, however high risk remains for construction <br />related � for ot` 4 features of A -LP. NNMP, Reaches 2 through 6 <br />procurenf&4 .has beery completed. Procurement activities for the Project <br />Operating Ftility, and Lake Nighthorse boundary fencing have been <br />Completed. # pickup truck has been ordered for the Association. No <br />olhZ,progrtss on procurement of first fill heavy equipment. Work on the <br />coA 40 o, the installation of the security and communications contract <br />has boft substantially completed. <br />2. No change in risk rating <br />Materials pricing increases and shortages <br />1. Steel prices appear to be declining, and have dropped approximately 2.3% <br />over the past year The risk rating was revised to indicate unchanging risk <br />2. No change is risk rating <br />Funding <br />1. The funding level will continue to be worthy of concern. The magnitude <br />of this risk has been reduced by the completion successful start of the first <br />fill, and recent contract awards. However, this situation has considerable <br />