My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCC Meeting 7/8/10 Notes
CWCB
>
ALP Project
>
PCC Meeting 7/8/10 Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/16/2013 1:00:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — July 08, 2010 <br />Version: August 30, 2010 <br />IV. Status of Identified Significant Risks <br />A. Dam outlet works construction <br />1. No change in risk rating. <br />B. Reservoir First Fill <br />1. The filling of the dam continues and the second 30 -day reservoir `hold' <br />period has started. Approximately 70,000 acre -feet are in storage. <br />Performance of the dam has been satisfactory. Releases, if necessary, <br />must be through the tunnel that is functional. The structure and all <br />associated features are being monitored 24 hours per day, seven days per <br />week, in accordance with the "Initial Filling Criteria" during fill periods <br />and `hold' periods. The 24/7 monitoring will contii ud through this second <br />hold period. Pumping is planned to resume in A;�gust, 2010; however, <br />flows in the Animas River will influence #0- amdUht of water that is <br />capable of being pumped. Pumping will c inue ror ;jt2 to 18 months <br />once pumping resumes. Risk of imp leting,reservoir ftl1ft' due to <br />structural performance of the dam does not appear to be it t• aatng. <br />2. No change in risk rating <br />C. Hydrological events <br />1. The SNOTEL sites in the Animas Rived kasin are currently at 0% of the <br />average Snow Water Equivalent (SWE) f6;xhis time of year. The Animas <br />River has been flowing - fxoughly the 90 perceibt exceedance level since <br />mid -June. Impacts to theirsf fill duration are impossible to predict with <br />certainty; however, it appears the first fl period will extend into summer <br />of 2011, at a minimum. <br />2. No change'rl rating <br />D. Durango P.urnping PLt <br />1. Redlam'abon is c0' ently in the Oracess of resolving outstanding <br />contractuatYssu J�y�ryer, inflation effects and the net cost of <br />tncbdfying the contract are.ciirirently unknown. The main unit and <br />auxiliary control lcstems have been installed. Functional testing of the <br />auxiliary systems has {been completed. Challenges in electrical and <br />mechamcal'equipmerii "fabrication and installation, partially resulting from <br />the electricaJe- design, are being addressed. These challenges resulted in <br />Some of the ftoat, built into the schedule for first fill, being used. <br />2. T lie are currently some issues with the mechanical seal water system, the <br />Conitfir has elected to install larger pumps in an effort to prove that the <br />systeri "installed meets the specification requirements There are other <br />minor issues involving, the cooling water system, the main pump and <br />motor units, the piping, the strainers, and the fish screen cleaner. The <br />issues are relatively minor in some instances, but may require some <br />additional work or redesign efforts prior to transfer to O &M status. There <br />are some issues with the seals on units #2, #4 and #8. The contractor is <br />working diligently to resolve these issues. <br />3. Additional studies have shown that the Obermeyer Crest Gates will not <br />operate properly in the conditions in the Intake Structure. The differential <br />required in the water surface across the gates is not available during <br />
The URL can be used to link to this page
Your browser does not support the video tag.