My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCC Meeting 7/8/10 Notes
CWCB
>
ALP Project
>
PCC Meeting 7/8/10 Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/16/2013 1:00:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — July 08, 2010 <br />Version: August 30, 2010 <br />"it All c6h' uction is complete <br />d. S6N ules 2 through 6 <br />i. Nlty locates' are ongoing <br />Stiteys are ongoing <br />ne construction is underway <br />iv Tat foundation at Nenahnezad Hill is underway <br />8. EndAi6n n�ntal <br />a. C Mpliance oversight for construction continues <br />9. Cultural Resources <br />a. Classification is complete <br />b. Work is ongoing to publish documents <br />c. Pedestrian surveys for fencing are complete <br />F. Pending Key Project Decisions <br />1. If First Fill progresses to a point where conflict with other activities or <br />features becomes imminent, a decision will be necessary whether to <br />continue. <br />a. <br />Revegetation efforts are complete <br />i. Not quite 70% success, but will reassess at a later date <br />b. <br />Guardrail installation is underway <br />3. <br />Security and Communications <br />a. <br />System installation is 89% complete <br />b. <br />Training completed for new system <br />4. <br />Durango Pumping Plant <br />a. <br />Repairs to EIFS accomplished <br />b. <br />Temporary retrofit of crest gates is complete <br />c. <br />Fencing installations are complete <br />d. <br />Mechanical seal water retrofit is complete <br />i. Testing is underway <br />e. <br />Revegetation assessment underway <br />f. <br />Auto - excitation system adjusted <br />g. <br />Motors have been synchronized <br />5. <br />Permanent Operating Facility <br />a. <br />Awarded March 4, 2010 <br />b. <br />95% design complete <br />6. <br />RBIC <br />a. <br />Cathodic protection has been tested <br />i. Awaiting final epprt <br />7. <br />Navajo Nation Municipal- pip- <br />a. <br />Fruitland Reach <br />i. 99 %o complete <br />b. <br />Farr 'in' each <br />i Constrit6 on of tank ' s. complete <br />it I'ipelme work is 90% complete <br />c. <br />Honzdntal Directional Drillti <br />"it All c6h' uction is complete <br />d. S6N ules 2 through 6 <br />i. Nlty locates' are ongoing <br />Stiteys are ongoing <br />ne construction is underway <br />iv Tat foundation at Nenahnezad Hill is underway <br />8. EndAi6n n�ntal <br />a. C Mpliance oversight for construction continues <br />9. Cultural Resources <br />a. Classification is complete <br />b. Work is ongoing to publish documents <br />c. Pedestrian surveys for fencing are complete <br />F. Pending Key Project Decisions <br />1. If First Fill progresses to a point where conflict with other activities or <br />features becomes imminent, a decision will be necessary whether to <br />continue. <br />
The URL can be used to link to this page
Your browser does not support the video tag.