My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCC Meeting 7/8/10 Notes
CWCB
>
ALP Project
>
PCC Meeting 7/8/10 Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/16/2013 1:00:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — July 08, 2010 <br />G. <br />H. <br />Version: August 30, 2010 <br />a. Reclamation will not make these decision alone, and will consult with <br />the PCC to assist in making decisions that become necessary <br />b. No external activities are anticipated to affect the First Fill at this <br />time; however, this item will remain as a key decision that potentially <br />may need addressed in the future <br />Construction progress photos <br />1. View of Lake Nighthorse <br />2. View fish mortality testing <br />3. View of fish parts <br />4. View of boat ramp access road construction <br />5. View of riprap repairs at energy dissipation structure <br />6. View of riprap repairs at energy dissipation structure <br />7. View of riprap repairs at energy dissipatioi�strui" <br />8. View of boundary fencing construction <br />9. View of guardrail installation <br />10. View of NNMP mitre bend <br />11. View of NNMP dresser coupling installation <br />12. View of NNMP pipeline welding <br />13. View of soil cement placing <br />14. View of tank foundation construction <br />15. View of tank foundation <br />90 -Day Look Ahead <br />1. Durango Pumping Plant <br />a. Resume pumping <br />b. ComtilrtiSnnrhlict item <br />2. <br />3. <br />4. <br />5. <br />a Ips #all roll >t door at the engine generator room <br />d. lete reirs to all pumps and motors <br />e. Modl"e swage .ejectoretting system <br />g ,nues du 'gn of SCADA system <br />h. Begitl grc flashily <br />i. Corr &dt ice dam issues on roof <br />i. It is;urrently looking like the resolution will include the <br />ins* lation of heated panels to prevent ice damming <br />it iidges Basnt Inlet Conduit <br />acme test report for cathodic protection system <br />Ridge' sin Dam <br />a. Complete punchlist mechanical/electrical equipment <br />b. Continue sleeve valve testing for fish mortality <br />c. Continue First Fill monitoring <br />Security and Communications Contract <br />a. Complete system installation <br />b. Complete system testing <br />Recreation — Boat Ramp (non - federal) <br />a. Begin construction of parking area (modify CR211) <br />b. Continue access road construction <br />
The URL can be used to link to this page
Your browser does not support the video tag.