My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PCC Meeting 7/8/10 Notes
CWCB
>
ALP Project
>
PCC Meeting 7/8/10 Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/16/2013 1:00:10 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — July 08, 2010 <br />Version: August 30, 2010 <br />e. Earned to date: $1,546,501 <br />i. Previous repost - $0 <br />f. Current net contract value: $33,196,352 <br />i. Previous repost - $33,031,323 <br />g. Current contract completion date <br />i. November 14, 2011 <br />h. One modification issued since last PCC meeting <br />i. CCE transfers <br />(a). #03 - Archaeological monitoring - $24,717 <br />1. To monitor for cultural resources;; for the entire stretch of <br />the pipeline <br />ii. Change order modifications <br />(a). #04 - Hwy 64 crossing, boring".: 6 . RRA) -($35,024) <br />1. Changed from cut/cover to bonny =end jacking under the <br />highway <br />(b). #OS -Hwy 64 crossing, boring (ARRA) 0;378) <br />1. To change the , e from steel pipe, to ste I a ing and <br />PVC pipe of the r4,ad crosAfig <br />(c). #06 -FYI 0 funding modiftion - $0 <br />1. Increase the funding for the contract <br />iii. Total value of' odifications - $ 5,75,936 <br />iv. CCE transfers $ 57.,621 <br />v. Change orders - $$,31' <br />i. No undefinitized modifications peed -, g' finalization <br />j. Two Rd' Xit s for Proposal pending <br />i Alignmont changes along Hwy 64 <br />{a). There is a house off oi'the hwy that will require re- routing of <br />i. Aliment clinge, from sta. 1470+00 to end <br />(a). ie 'ip t fields are in conflict with the original design <br />k. Comp,nson of CCE to Contract Amount <br />i Current cotittAct value - $33,013,638 <br />ii. Current contingency - $3,958,115 <br />iii. Fieid %Cost current - $36,971,753 <br />13. 1�3I�P is approximately 36% complete overall <br />D. Computiii6, Management Reserve <br />1. Net pous update - ($987,562) <br />2. Net this update - ($1,132,168) <br />3. Percent complete - 73 %, through 2nd quarter FYI <br />E. Progress Report <br />1. Ridges Basin <br />a. Outlet works is 95% complete <br />b. Electrical installations are substantially complete <br />c. Fish mortality studies are ongoing <br />d. Reservoir is at elevation 6841 feet (41 vertical feet to go) <br />2. Upper County Road 211 <br />
The URL can be used to link to this page
Your browser does not support the video tag.