My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 21
CWCB
>
ALP Project
>
ALP 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 1:15:16 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
r <br />ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE 1 -5 -12 UPDATE: 52.2% COMPLETE <br />Nov '11 Dec'11 Jan '12 Feb'12 Mar'12 Apr'12 May'12 Jun '12 Jul'12 Aug '12 Sep'12 Oct '12 <br />16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 4 11 18 25 1 8 11 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 30 7 4 14 ' 21 <br />Ridges Basin Inlet Conduit <br />No Trespassing signs @ Dissipation Structure <br />Lower Basin Creek Flash flood warning signs <br />Separation of F x F couplers on COD filing line <br />Fence Around Outlet Structure <br />Buoy String @ Diss. Structure <br />Install Fixed Ladders in all Vaults <br />Label on "MPE" on control panel "MCCA" needs to be corrected ii <br />Supply Equipment to Drain RBIC (Item added to general equipment list) 1 <br />RBIC Design Issues <br />Safety Items <br />Spill Kits Around Motors om <br />Resolve Issues with Drops #4, #8, and Baffled Outlet <br />Resolve Issue With State Instrumentation at Drop #13 <br />Fish Outfall Structure Safety Grating - <br />Mark locations for crane outriggers on intake structure <br />Basin Creek <br />;Nov'12 Dec'12 <br />28_ 4 '11'18 25 2__, <br />WCAO FACILITY MANAGEMENT GROUP (FMG) IT <br />MISC ADDITIONAL ITEMS MISC ADDITIONAL ITEMS <br />Newport Infinity digital readout devices in ACP @ RBD Cntrl Hs <br />Relocate 3 -Inch ball valve in RBIC air chamber vault <br />Supply all RSN's to OMRA <br />Project: ALP O &M TRANSFER ISSUE Task Milestone p Rolled Up Task Rolled Up Progress External Tasks Group By Summary <br />Date: Sun 3/4/12 Progress Summary Rolled Up Milestone O Split Project Summary Deadline v <br />Page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.