My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 21
CWCB
>
ALP Project
>
ALP 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 1:15:16 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE 1 -5 -12 UPDATE: 52.2% COMPLETE <br />Nov "11 Dec" 1 Jan '12 Feb'12 Mar'12 Apr'12 Mav'12 Jun '12 Jul'12 Auq'12 Sep'12 Oct'l2 Nov'12 Dec'12 <br />16 23 30 6 13 20 27 4 11 18 25 1 ' 8 ! 15 22 29 5 12 19 26 4 11 18 ' 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 ! 29 5 12 19 26 <br />2 9 16 23 30 7 !14 21 28 4 11 18 25 2 <br />e MCC Meter Correctly' <br />Back Cover for Alarm Cabinet <br />xtend Ground from MCC to ACP <br />MA Class III <br />Train /Bundle all Wires Correctly III <br />Fuse Blocks in ACP <br />® Adjust transformer taps <br />Add Missing Nameplates /Signs mmz= <br />DJA Handle -Ties for Breaker Gi <br />Clean /Replace all Luminaires <br />Fix Ventilation System in Tunnel - <br />Re -key all exterior doors r= <br />Provide keys to all lockable cabinets p <br />Adjust Limit Switches on 4'X 6' Guard Gate , <br />Maintain Access Roads <br />Calibrate Meters on Aux Cntl Panel (ACP) G <br />Calibrate Flowmeter, Provide Training jo <br />Functional Test HVAC iiiQ <br />Install Coverplate for NT1 thermostat ja <br />Install thermostats for each heater (2) <br />As- Builts for E-G /LPG Piping <br />Spare Parts and Tools wounddonow <br />Sign Tunnel Door Confined Space <br />Provide Oil Filter Cart (added to equip list) • <br />Repair Coating on 8" Bypass @ 36" Line 6 <br />Fuel Capacity/Use Data on LPG Tank f <br />Re -key all exterior control h ruse doors jiiga <br />Provide Portable Dam Instrumentaion Equipment i <br />Create SOW for Boat Ramp drainage <br />Complete boat ramp drainage work <br />Ridges Basin Dam Design Issues <br />Use Security Cameras on Dam <br />Large signs on Dam face "Closed to Public" <br />Identify helipad locations at Dam <br />Calculate Losses/Travel for Releases �I <br />Ensure no Fish Escapement <br />Project: ALP O &M TRANSFER ISSUE <br />Task Milestone p Rolled Up Task Rolled Up Progress External Tasks <br />l Group By Summary <br />Date: Sun 3/4/12 <br />Progress Summary Rolled Up Milestone O Split Project Summary <br />Deadline O <br />Page 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.