My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 21
CWCB
>
ALP Project
>
ALP 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 1:15:16 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE 1 -5 -12 UPDATE: 52.2% COMPLETE <br />Nov '11 Dec '11 Jan '12 Feb'12 Mar'12 Apr'12 May'12 Jun '12 Jul'12 Auq'12 Sep'12 Oct'12 Nov'12 Dec'12 <br />16 23 _30 _6 13 20 27 4 11 18 25 1 8 ;_15 22 _29. 5 12 19 26 4 11 18 25 1 8 15 22 29 6 13 20 27 3 10 t 17 24 1 8 15 22 29 5 12 19 26 2 9 16 23 30 ' 7 14 ! 21 28 4 ' 11 18 25 2 <br />.......... <br />Stairwell Electrical Boxes Need Covers _ <br />Ventilation Needed on Elevator Control Cabinet <br />Fire Alarm Strobe (east side) is Broken <br />Exterior Lights are Staining the Building Finish <br />Cover on Electrical Outlet Damaged S <br />EIFS Colors Do Not Match <br />p North and West Entry Door Stick Intermittently <br />Electrical Receptacle Missing Cover I) <br />Louvers Paint Does Not Match <br />Air Conditioner has Bent Evaporator Coil fins g <br />Top of Air Conditioner is Damaged (bent downward) G <br />Boiler Exhaust Pipes are Damaged <br />Replace damaged fire alarm strobe on east exterior side of building <br />RBIC Air Piping - new condensate dump needed with heat trace G <br />Concrete Slab at Compressor is Settling <br />Asphalt is Settling North of Compressor <br />Access Door Threshold at Air Chamber has Damaged Concrete g <br />p CP Test Station Box not Secured to Wall (air chamber) <br />Adjust Seal at Service Bay Overhead Door <br />Install wall mounted jib crane to access #8 Suction Valve <br />Outer door for EG Rollup Door <br />Unit Bay Crane Access <br />Orifice Plate Embedded in Concrete <br />Wire Permissives to Small Units <br />Remount Guard Valve Operators <br />Durango Pumping Plant Design Issues <br />Ridges Basin Dam Items <br />Pipe Leak @ Sei.tion 8/9, 14/15 p <br />Repair corroded duct work on the ventilation system in the tunnel <br />P2P Testing, and Wiring Diagrams (DUPLICATE) <br />Correct all Tags, Verify BOM <br />eter, Disconnect Shaft@ <br />Project: ALP O &M TRANSFER ISSUE Task Milestone p Rolled Up Task Rolled Up Progress External Tasks _._. 4� Group By Summary <br />Date: Sun 3/4/12 Progress Summary Rolled Up Milestone O Split Project Summary Deadline <br />Page 19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.