ALL ITEMS - ALP TRANSFER ISSUES SCHEDULE 1 -5 -12 UPDATE: 52.2% COMPLETE <br />Nov '11 Dec '11 Jan '12 Feb'12 Mar'12 Apr'12 May'12 Jun '12 Jul'12 Aug'12 Sep'12 <br />Oct'12 Nov'l2 Dec'12 <br />16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 4 11 18 1 25 1 8 15 22 29 6 13 20 27 3 10 17 24 1 8 15 22 29 5 12 19 26 2 9 <br />16 23 30 7 14 21 28 4 11 18 25 2 <br />Fan Needs Guarding <br />West Side of Building has Failed Caulk <br />Order staff gauge with angle required for side of intake at trash racks Q <br />Install Staff Gages at Inlet <br />Complete HVAC c@ Control House iia <br />Ensure Pressure Switch on Compressor is Correct <br />Install permanent brackets on Fish Screen Drive Unit Grease Pipe <br />Trolley cable is Frayed ga <br />Remedy the Heat Tape Installation on Limit Switches ja <br />I -Beam for Trolley Showing Excessive Wear <br />Permanately Mount the Ring Bouys <br />Intake Structurep <br />Install UV Protection for Seal on Bulkheads p <br />Replace Frayed Cable on Eulkhead Rigging Iii <br />Intake Structure /Control House Design Issues <br />Redesign Obermeyer Gates <br />Resolve Silt Buildup Issue in Forebay <br />Redesign Sweep Trolley Bearings <br />Provide Trash Rake♦ <br />Install Fixed Laddders Both Sides of Screen I <br />Install Filling Valve on Bulkhead Gate <br />6461 Elevation <br />Fix Roll -up Door on E -G Room <br />Corrosion on CoD Air Compressor <br />Install electrical cover on box in E -G room p <br />Entry Door Lockset Damaged II <br />Lock Cylinders Missing on Workroom Doors la <br />aking Water® <br />Floor Sealer Need Applied am <br />Need Service Bay Crane Access <br />Caulk East Entry Door Threshold <br />Elevator Room Fire Extinguisher Needs Mounted III <br />Project: ALP O &M TRANSFER ISSUE <br />Task Milestone 0 Rolled Up Task Rolled Up Progress External Tasks <br />—1 Group By Summary <br />Date: Sun 3/4/12 <br />Progress Summary Rolled Up Milestone O Split Project Summary <br />Deadline O <br />Page 18 <br />