My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 21
CWCB
>
ALP Project
>
ALP 21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 1:15:16 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t � <br />COMPLETED ITEMS - ALP TRANSFER ISSUES SCHEDULE 3 -5 -12 UPDATE <br />ID © Task Name Start Finish Jan '10 Feb'10 Mar'10 Apr'10 May'l0 Jun '10 Jul'10 Auq'10 <br />27 3 10 17 24 31 7 14 21 28 7 14 21 28 4 11 18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 <br />1 A -LP Project Wide Mon 8/2/10 Fri 9/28/12 A -LP Project Wide <br />15 �j V Provide ArcFlash Training Mon 8/2/10 Fri 11/18/11 Provide ArcFlash Training ®,,, <br />24 Durango Pumping Plant Mon 8/2/10 Fri 9/28/12 Durango Pumping Plant <br />25 Site Work Sun 5/1/11 Thu 7/26/12 <br />26 V Post No Tresspassing Signs Sun 5/1/11 Tue 5/10/11 <br />34 Plant -Wide Mon 8/2/10 Fri 6129/12 Plant -Wide <br />37 ✓ V Repair Ice Damage Roof Mon 8/22/11 Fri 11/18/11 <br />38 Repair Ice Damage EIFS Mon 8/2/10 Fri 9/30/11 Repair Ice Damage EIFS <br />39 j Install sign for elevator room door Tue 12/13/11 Tue 12/13/11 <br />40 fV Guard Elevator Moving Parts Mon 11/21/11 Fri 11/25/11 <br />41 tj V Fire Stop Elevator Duct Chase Mon 8/22/11 Mon 8/22/11 <br />42 f "V Temp /Humid Monitoring elevator Room Mon 1/2/12 Tue 1/3/12 <br />43 �j Elevator Brake Missing Anchor Mon 8/22/11 Thu 10/20/11 <br />46 f V Cranes Need cutoff Switch at end of Travel Mon 2/6/12 Mon 4/30/12 <br />47 V North Stairwell Conduit Penetration needs Cap Mon 8/22/11 Tue 9/6/11 <br />50 tj Repair Phone in Elevator Tue 1/3/12 Tue 1/3/12 <br />55 f V Ventilation for elevator controls (duplicate) Mon 8/22/11 Mon 8/22/11 <br />56 �j V Low gas pressure in cameras Wed 6/15/11 Wed 6/15/11 <br />57 6418 Elevation Fri 1011/10 Fri 8/31/12 <br />65 �j Seal Strainer Drain Fri 10/1/10 Thu 10/7/10 <br />67 Oil Leaks on Sump Pumps Tue 3/1/11 Wed 3/2/11 <br />68 tj Oil Leaks on Pumps /Motors Tue 3/1/11 Tue 3/1/11 <br />69 tj Fix Intermittent RTD Problems Tue 3/1/11 Mon 3/28/11 <br />71 �j V Repair INPRO Seal Leaks Tue 3/1/11 Tue 3/1/11 <br />73 tj V Cavitation issue Mon 8/22/11 Mon 8/22/11 <br />77 r' V Verify Control Wiring to Tiger Flow Thu 12/1/11 Fri 12/30/11 <br />80 tj Cap Cross - Connect to Seal Water Tue 1/17/12 Wed 1/25/12 <br />81 4% V Grout under MOBVs Sun 5/1/11 Fri 5/13/11 <br />82 �j Gage on Sump Drawdown Pump Broken Fri 10/21/11 Fri 11/18/11 <br />83 tj V Check Interior Coating Service Air Receiver, shows Rust Tue 1/24/12 Wed 1/25/12 <br />84 tj Remove PVC Pipe from Piping Area Mon 8/22/11 Fri 8/26/11 <br />85 tj Cover Missing on J -box for Tiger Flow Unit Fri 10/1/10 Fri 10/1/10 Cover Missing <br />87 Strainer Air Valve E5 Leaking Mon 8/22/11 Wed 8/24/11 <br />88 Strainer Backwash Lid not Secured Fri 10/1/10 Fri 10/1/10 Strainer <br />89 Broken Sight Glass on Both Strainers Mon 12/12/11 Fri 12/23/11 <br />90 Remove or Mount Fire extinguisher Between Units 4, 5 Mon 8/22/11 Mon 8/22/11 <br />91 tj Remove Cardboard in Expansion Joint Mon 8/22/11 Mon 8/22/11 <br />92 f Loose nut on Cantileverd Walkway, North end Mon 8/22/11 Mon 8/22/11 <br />94 Broken Light Cover on Walkway, near Unit 6 Wed 1/4/12 Tue 1/17/12 <br />95 �j Light Bulb Burned out on Crane Access Platform Fri 10/1/10 Fri 10/1/10 Light Bulb Burned o <br />96 Access Covers on EIM Operators not Secured Mon 1/23/12 Fri 1/27112 <br />97 6432 Elevation Fri 10/1/10 Fri 3/30/12 <br />98 Check Valves at Sewage Ejector Mon 1/23/12 Wed 1/25/12 <br />99 �j Leak and Insulation on Hot Water Circ. Pump Thu 12/1/11 Wed 1/25/12 <br />101 Pullbox Cover Open Overhead by Intake Duct Fri 10/1/10 Fri 10/1/10 Pullbox Cover Op <br />102 j Properly Store Spare Belts for main air handler Currently in Unit Mon 8/22/11 Mon 8/22/11 <br />103 �j Hot Water Control Valve Leaks Fri 10/1/10 Mon 10/4/10 Ho' <br />104 Repair Insulation On Hot Water Control Valve Fri 1/6/12 Mon 1/9/12 <br />106 �j Door Latch on main air handler Not Working Mon 8/22/11 Mon 8/22/11 <br />107 6447 Elevation Mon 8/2/10 Tue 7/31/12 6447 Elevation <br />108 Control Room Mon 8/2/10 Mon 7/2/12 Control Room - <br />109 Wire Mngmnt and Rack in Control Room Mon 8/2/10 Mon 8/16/10 Wire Mngmnt and Rack in Control Room <br />110 tj V Sec. Equip. Batteries Laying on Side Mon 8/22/11 Mon 8/22/11 <br />Task Milestone p Rolled U Task Rolled U Progress External Tasks - Group B Project: ALP O &M TRANSFER ISSUE P P «J - P Y Summary -- <br />Date: Sun 3/4/12 Progress Summa ry - Rolled Up Milestone O Split <br />Project Summary O— Deadline <br />Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.