Laserfiche WebLink
Part C - Document No. Document Title <br />Descriptions and <br />Specifications R10AV40R04 Recovery — Permanent Operating Facility , Animas -La Plata C -3 <br />Project, No. 3.000 TAS::14 0681::TAS <br />(15) The building commissioning processes shall verify achievement of design <br />performance objectives and goals, and shall utilize a methodology allowing all <br />team members to verify achievement of user goals. <br />C.2 Scope of Work/Program of Requirements Package <br />The Scope of Work/Program of Requirements Package will be provided to the three <br />highest evaluated firms selected from the Phase 1 design selection process. The Scope <br />of Work/Program of Requirements will be provided within an Amendment to this <br />solicitation. <br />