My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 18
CWCB
>
ALP Project
>
ALP 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:10:53 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — October 05, 2010 <br />Version: October 5, 2010 <br />e. Upcoming test in October at El. 6845 (57psi), at El. 6878 (72psi), at El. 6845 <br />(84psi) and El. 6882 live testing. <br />6. Analysis <br />a. Embryos are difficult to obtain represented fish and are rugged <br />i. Egg survival is 20% through all tests <br />ii. The intake is below surface elevation and eggs will be laid in the estuarial <br />waters around the lake edge <br />(a). Believe there is a low likelihood of eggs entering the intake <br />b. Fish tests show a high likelihood of working based on given data <br />i. Likelihood of minnows in intake is low as they will be in shallows around <br />lake. <br />(a). Minnows that travel near the intake are food for predatory fish. <br />c. Testing at El. 6882 will test without inserting fish into pipe behind valve. It will <br />test what actually enters the intake naturally. <br />IX. Mitigation Area Update <br />A. Nothing new to report on long -term management <br />X. Current/Upcoming License Agreements <br />A. The City of Durango has submitted a request for a license agreement to connect to the City <br />of Durango 30" pipeline at the Durango Pumping Plant. <br />B. The City has met with BOR to discuss connecting to the blind flange on the City of Durango <br />Discharge Line at the Durango Pumping Plant. BOR/COD /Association needs an agreement <br />on operations of the valves, power costs, etc. BOR acting as a facilitator as the agreement <br />will mainly deal with COD and Association. <br />XI. Repayment/Water Delivery Contracts Update <br />A. Letter from the State of Colorado wanting to initiate discussions on repayment. Page will <br />schedule soon. <br />B. O &M agreement with Navajo Tribal Utility Authority for NNMP needs to be initiated <br />winter of 2011. <br />XII. Final Cost Allocation (FCA) <br />A. Total time for cost allocation process is estimated to be 12 -18 months after the close of all <br />books (Colorado features) from start of allocation process. <br />B. BOR committed to a fast and efficient process. <br />C. Barry can provide cost reports to date. Sponsors need to provide Barry with what details <br />they would like. Barry will schedule time with sponsors, individually, to start discussions. <br />D. Issues to discuss: <br />1. Session on SPCCR first (first of the calendar year) <br />2. How do we deal with "Reasonable & Unforeseen "? <br />3. What is sponsor water cost? <br />4. Future budget requests can be foggy in this discussion. <br />XIII. Recreation Area Update <br />A. BOR looking into options for providing funding to assist ALPWCD's recreation planning <br />efforts. <br />1. Hurdles on the procurement side of things. <br />18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.