My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 18
CWCB
>
ALP Project
>
ALP 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:10:53 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — October 05, 2010 <br />Version: October 5, 2010 <br />i. Previous report — $4,815,180 <br />e. No modifications issued since last PCC meeting <br />i. CCE transfers <br />(a). None <br />ii. Change order modifications <br />(a). None <br />iii. Total value of modifications - $1 ,137,680 <br />(a). CCE transfers — $0 <br />(b). Change orders — $1,137,680 <br />f. No undefinitized modifications pending finalization <br />g. No Requests for Proposal pending <br />h. Comparison of CCE to Contract Amount <br />i. Current contract value — $5,766,180 <br />ii. Current contingency - $0 <br />iii. Field Cost current - $5,766,180 <br />12. Schedules 2 through 6 - NNMP ( #R09AV40001) <br />a. Award on September 30, 2009 <br />b. Net award amount: $27,737,702 <br />c. Time elapsed — 45% <br />i. Previous repost — 28% <br />d. Percent complete —17% <br />i. Previous repost — 5% <br />(a). Concerned w/ completion date, talking to contractor <br />e. Earned to date: $5,765,410 <br />i. Previous repost - $1,546,501 <br />f. Current net contract value: $33,653,352 <br />i. Previous repost - $33,196,352 <br />g. Current contract completion date <br />i. November 14, 2011 <br />h. Three modification issued since last PCC meeting <br />i. CCE transfers <br />(a). None <br />ii. Change order modifications <br />(a). #07 — ARRA materials for Shiprock Tank — $182,714 <br />1. Modification in the future to build and install tank <br />(b). #08 — Pipeline revisions — $425,000 <br />1. The design is old and the specifications have conflicts with unknown <br />utilities (gas, water, electric) being found <br />2. Miter bends being realigned and one was damaged <br />a. In conversations with contractor over repair method <br />(c). #09 — Funding for Partnering — est $32,000 <br />1. Outside facilitator for communication between contractor and <br />Reclamation. <br />iii. Total value of modifications - $ 5,915,650 <br />iv. CCE transfers — $ 5,267,621 <br />v. Change orders — $648,029 <br />i. One undefinitized modifications pending finalization <br />i. #09 — Funding for Partnering — est $32,000 <br />W <br />
The URL can be used to link to this page
Your browser does not support the video tag.