My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP 18
CWCB
>
ALP Project
>
ALP 18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/11/2013 12:10:53 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
138
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PCC Meeting — October 05, 2010 <br />Version: October 5, 2010 <br />(d). Approaches for Tribute Garden — rec'd <br />(e). Design changes at boat ramp parking area — rec'd <br />(f). Guardrail on Boat Ramp Access Road — rec'd <br />(g). Installation of rock check dams at LPWWA <br />i. Comparison of CCE to Contract Amount <br />i. Current contract value — $17,011,262 <br />ii. Current contingency - $3,196,040 <br />iii. Field Cost current - $20,207,302 <br />10. NNMP — Fruitland Reach ( #8075) <br />a. Attendees were reminded that this was designed many years ago, and since then <br />there have been houses, septic systems, and similar construction built that now <br />interferes with the original alignment. <br />b. Time elapsed —100% <br />i. Previous report — 96% <br />c. Percent complete — 89% <br />i. Previous report — 82% <br />d. Earnings to date — $8,267,481 <br />L Previous report — $7,687,302 <br />e. Current net contract value - $9,328,107 <br />L Previous report — $9,325,845 <br />f. NTP issued December 15, 2008 <br />g. Contract completion is June 18, 2010 <br />h. One modification issued since last PCC meeting <br />i. CCE Transfers <br />(a). None <br />ii. Change orders modifications <br />(a). 408 — 2" NTUA Waterline Relocation - $2,262 <br />1. NECA ran into an unexpected 2 -inch NTUA waterline. They had to <br />provide temporary water to the residence, remove waterline, place <br />pipe, then reinstall waterline <br />(b). CCE transfers — $37,476 <br />(c). Change orders — ($166,272) <br />i. One undefinitized modification pending finalization ( #01) <br />i. #01 — Parnering workshops — est $37,476 <br />j. No Request for Proposal pending <br />i. — Repairs to chip /seal surface on road N367- rec'd <br />k. Comparison of CCE to Contract Amount <br />i. Current contract value — $9,328,107 <br />ii. Current contingency - $809,503 <br />iii. Field Cost current - $10,137,610 <br />11. NNMP — Horizontal Directional Drilling ( #8225) <br />a. Time elapsed —100% <br />i. Previous report — 100% <br />b. Percent complete —100% <br />i. Previous report — 100% <br />c. Earnings to date — $5,766,180 <br />i. Previous report — $4,567,099 <br />d. Current net contract value - $5,766,180 <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.