My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
FAIRPOSIT AND NEED, RECOMMENDATIONS AND (:OMMITMENTS <br />level of imlpact. The tniligaliou illeasures Cor each 1- csoill-ec Impact were rliscus�:Cd in Chapicl- . 11.1 <br />addition to the specific mith'alil:)m measures idenlilicd in Chapter 3. other management practices will be <br />employed (luring construction activities to nlininliic cnvirm n eivial enhos and hill be included in <br />construction Specifications. Many of these measures are requirml is order to c(lmply with Icdcral, stale. <br />or local laws and rc-,ulations, regardless of,whethcr Illey are 'pecilically identified in the reporl. <br />Reclamation will comply with all relevant Iederal, slate and local laws, ordinances, and <br />standards during the hnplcn wartion of the. Prelcrred Allernat.ive. Reclamation will Iwisi are ,lad <br />implement all 1?nvironlllcntal Conlnlitnlcalt Hall for tile. proicCI to d0C11111Cnt and uOCk the u)nlplctilin oI <br />u+ <br />the environmental Coll) lnilnlenls. `0 <br />5.4.2 Water Resources and Hyclrology Commitments <br />Reclamation gill dcvclop an operations plan Ior the RiWgcs Basin Pumping I "brit that will schedule <br />pnmpin!; From the Animlas River in :I manner to limit impacts to nirn-t -' domdo Ihe.'I ?Hml cWhics' ability <br />to Wain water Irons the tiara .loan River as do cribe(I under Mityalinn Vol' Ihe. Rclincd !UCIlrativc id <br />I lych-olory Illlpae( ,"_. ill Nection 3.2. <br />Reclamation will wort: with all apprtOprialc State. and Icdcral agencies II;I pursue a method tO protccl ALP <br />Prnjcct water return Il(nvti ill the I.a Plata River draimagc as a w:ilcl- supply for endamgcrcd lish as <br />described Milder Mill alioll 101. RClllled Alternative `I llydrol), ;y Iml) Ict. 3 in Section 3.2. <br />Rcclaolation will (lesign and devclup Ri( g" nasin Reservoir will it nlinililum PmA 01 =01 at*. <br />5.4.3 Water Quality Commitments <br />Rcc.lanlatil:nl will develop and implenmo a pl•cigmm to re(IIICc. I111II1mhc Or elllll)Ilall' temporary. churl <br />lcrnl increases in suspended scdinwnt loading or other Water (Inahty COIINIit(lelllti. I)o1el1lla11w CaLISC(I bl' <br />project construction, through the hlcomomlion ol'pernlits, Lies) Management Practices (13141Ps" and <br />sedirllent control structures as described Tinder Mitigation Im- Relined Alternalive 4 Water Quality <br />lnlpacts 1 -3 in Section 3.3. <br />Rcclannation will develop and inlplenlcnl a program designed to rc(lucc, minimize or eliminate the <br />leluliorary. short -term increases ill suspeluled sediment loading, (hat clay potentially occur during <br />construction ol'the non - binding end 11Scs :111(1 water cUI10,wrice Sy5lens Ihrongh retpdring developers <br />and consirliction contractors to lllcoI'llorate 13MPs and Sediment COIl(rol devices as described under <br />Mitigation kw ReMled Alternative -1 Wafer Oriality Impact 6 in Section 3.3. <br />IZCCI:11118tIC)Il 1vill <br />develop. wl(h tllc Southern the Inditm Ubc ml (Ill' !States nl Coh-l'ado <br />and New 0, <br />Mexico, and implement <br />a program to monitor water gtlalily in file Animas River <br />fi-Mll 1110. <br />Durango % <br />Ptllllping Plant to <br />die cmMunwe. will the Sills .limn IZIv(n' t()1' I Ive yems inlet' t o <br />Dlll'allpo <br />IN"lplllg Pkml % <br />'%. <br />begins opemliom <br />Ile Ile pAm will be dnTlop(xl lO IIIiI"hor compliance with Tribal <br />and <br />stale 1v:uer <br />quality standards <br />and criteria. 'Me plan shoul(I include: nhjec.tives, quality assurara: <br />and <br />c,nlin-.1i plans. '%) <br />and nimconlpfiancc measure~. <br />5.4.4 Vegetation Commitments <br />Rcclanrllion will cuxure that construction conlrac(ors limit around disturbance to the smallest icasihle. ';4) <br />areas, and will ensure that consuvction contraclols implement 13MPs, alone, Willi (Ile planlillk or re.- <br />5 -11 54 ENVIRONMENTALCOMMIIMENrS <br />
The URL can be used to link to this page
Your browser does not support the video tag.