My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CWCB Repayment Contract ALP
CWCB
>
ALP Project
>
CWCB Repayment Contract ALP
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 2:38:13 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
t11APT1 =11 <br />PURPOSE= <br />12(:-:C0MMENDATION5 AND r:OMMI VMt;NTS <br />`!f seeding d ~turbot areas using native plant sltc.cies to assist in the rc•eslahlishlltcnl ofn.itive: vc,'Clalion as <br />'%u described under Milii,atititt li)r Relined Allcrnalivc 4 Vywation InliNio i in Wiwi 3.-t. Where <br />% &O&Wv, c ircctional boyhys will he used for river pipeline erosdig. <br />'X Rechmal on will compensate the loss ofapproximatcly 1145 acres ol"rlplsn d vegetation resultinlc troll+ <br />% the consll Iction of the Ridgcs Basin Rcsurvnir, the Durango Pu+npin,t Plant, and other features its <br />Wl described undcr Milig'alian for Relined Alternative •I Vegetation ImPacls I and 2 in Section 3.4 as part ill <br />% the wilclli c nlil.igation plan. The compensation will be purl +if the total estimated 2,700 - 2,1)00 acres of <br />% wildlife I tbital to be acquired and enhanced to conlpeusate the loss ol"wiltllilc habitat in Ridges linsin. <br />% The ntili, Itioll land acquisition will be completed prior to initiation of ground- breaking construction <br />activities It iIIC resent,oir and pumping plant silts. Reclamation will attempt In acquire Im.ge Contiguous <br />acreage a id will attempt u) acquire these lands First in the river hasins that will be affected by the AI .I' <br />Project, .1 Id then outside orlhose basins, wilh the final decision made ill consull;llion with slate and <br />federal w Idlife agencies. <br />Re.tolaluai jon will compensate the lass or 134 acres orwethrid/riinfHan hahihA at a ntiligatii+n ratio <br />sufliciell to replace of. exceed the habitat value of wetland /riparian habitat I,)tit as described undcr <br />Mitit,ativ t for Relined Alternative 4 Vegoallnn Impacts 3 and 4 III tiection 3.4. Reclamation will <br />replace. lr st: tvetlandh iparian areas at a planned ratio of 13: i. Ihus uNwirlg approximately 3110 acres of <br />replacenl •nt wetlands. Mitigation will involve a program or land Oquisilion, wetland devchtpnlcnl, and <br />long-1cril I management. To the latent pmAhle, This progrant will be integrated into tile wildlife h ;ihital <br />nlitig,atio i program to expand herretils anti provide i;u'pe blocks ofcontijuot+, twildHIT haIMI. For <br />purposes ofthis FSLIS. it is issulne(I !i( ?O acre, will be necessuy liar the w•Clland program. Because of <br />limiletl ater supplies for new wetland creation in the rcgiou, restoration of(legraded wetlands will he an <br />imporlal component orally \voland plan. As with wildlife habitat mitit "'mioll, Ilia I.a Plata lover Basin <br />WM he c; Vol first priority 161. wetland development. Land: I'or wetland Mitigation will be acquired prior <br />%, In initial. on of cons( ruclion of Ridges Basin Dam anti overall twelland mitigation physical lealnres will be <br />°() at least if percent completed prior to beginning, reservoir tilling. <br />% Reclarnalion will also nutrlilerr the Animas River riparian corridor to help determine any e ffcels rlflltc <br />% pt+ntpin, reg,inlc Lill Ihesc downstream resources. I`he MunNO+ing will alst:, include Basin Creek <br />wetland.. Reclamation twill also unlit ground disturbing activities clue to construction or ilk NN NAP anti <br />°�, other pit clines anti will replace in a 2:1 ratio, riparian lreez (cottonwoods) lost clue to Construction. <br />Rcelant: tion will require that development of non - binding lend uses avoid` or mininliies consh'uGiort <br />impacts o wetland a"d riparian vegetation located within c.oukhr alignments of the non - binding: water <br />conve-ya te-e. pipelines. Rcclarnation will require that construction rimes he kept to the ill inirtttill) sixe <br />needed 1 n+cel proiCet objectives. Iravoidance is not possible, n ripariafMoland miligaliim and <br />monitor ng Plan will be developed to compensate For the loss of vegelation cover as described under <br />Mil n for Relined Alternative d Vcgoaliim Impact S in Section 3.4. <br />5.4.5 I Wildlife Commitments <br />%, Rcclanl Ilion will mitigate the: direct anti indirect loss ol'approxilnalely 2,700-2,900 :acres of tviltllirc <br />%+ habitat trough the purchase, cnha"Conenl, nrid management ol' approximately 2.700- 2,900 acres ul' <br />suiUlble land as described under Mitigation for Refilled Ahornative. 4 Wildlife Impact I in Section 31. <br />The no gal amount or land that will be acquired to obtain this Icvel of n+itil twill depend on the <br />pulenlil I wildlife. value orthe lands acquired. All rt:asufmHc attempts will be Inadc to acquil-C intercSls <br />in land on a willing: 5e.lY basis, using be simple, purchases, couscrvatiOn easements, purchase options, <br />54 CN+ONMENTAL COMM IIMFN7$ 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.