Animas - La Plata Project <br />Tracking of Modifications <br />Contract No. 04 -NA-40 -8051 <br />Dam Foundation Excavation, Roads, and Drop Structures <br />Modification <br />Date <br />12- Mar -09 <br />Number <br />Executed <br />Amount <br />Description of Modification <br />001 <br />28- Jan -04 <br />$ - <br />Modification directs changes to Drop Structure 4. Scope of work includes placing Zone 4A in the majority of the structure in lieu of <br />Zone 1, performing revised foundation excavation and cleanup requirements, placing a grouted riprap stilling basin, and placing <br />soil cement bedding under the drain pipe. <br />002 <br />02- Feb-04 <br />$ 85,000 <br />Modification directs slope stabilization on the downstream right abutment colluvium cut slope in the form of chainlink fabric, <br />shotcrete and ground anchors. <br />003 <br />004 <br />24- Feb -04 <br />01 -Mar -04 <br />$ 223 533 <br />$ 1.500,000 <br />Modification definitizes the contract Price adjustment for the changes directed under modification 001 <br />Modification directs work required to develop a portion of Borrow Area B. Scope of work includes stripping topsoil and removing <br />clay overburden. Overburden material was used to construct a suitable foundation for the materials processing plant for <br />processing dam embankment materials. <br />005 <br />05- Mar -04 <br />$ 755,127 <br />Modification directs work required to furnish and stockpile riprap materials for use in constructing drop structures and other <br />project features. Riprap obtained from a private source located North of Vallecito reservoir. <br />006 <br />04- Mar -04 <br />$ 187,000 <br />Modification directs the clearing, grubbing and disposing of all woody plant material from the portions of Borrow Area B and the <br />waste area North of Borrow Area B. <br />007 <br />008 <br />009 <br />010 <br />04-Mar -04 <br />24 -Mar -04 <br />08-Apr-04 <br />21 -A r -04 <br />$ 99,000 <br />$ 13 030 <br />$ 2 364 <br />$ - <br />Modification directs the installation of 16,000 linear feet of four strand wire stock fence 2 cattle guards, and 4 metal stock gates. <br />Modification definitizes the contract price adjustment for the changes directed under modification 007 <br />Modification definitizes the contract price adjustment for the changes directed under modification 006 <br />Modification definitizes the contract price adjustment for the changes directed under modification 005 <br />011 <br />26 -Mar -04 <br />$ - <br />Modification directs the extension of the well casing of an existing water well located in the area being constructed for the <br />materials processing plant. <br />012 <br />07-Apr-04 <br />$ - <br />Modification directs work to repair the headgate structure on the Pine Ridge ditch. Scope of work includes excavating by -pass <br />channel reconstructing the abutment and removing the by-pass. <br />013 <br />21 -A r -04 <br />$ 60,000 <br />Modification directs work required to perform rock excavation, using blasting techniques, to shape the shale formation unit <br />encountered on the Ridges Basin Dam left abutment. <br />014 <br />05 -Ma -04 <br />$ 37,518 <br />Modification requires the relocation of a stockpile of materials located in the area to be constructed for the processing plant for <br />future use on the project. <br />015 <br />016 <br />017 <br />02-May-04 <br />05-May-04 <br />20-May-04 <br />$ - <br />$ - <br />$ 40,000 <br />Modification directs the installation of riprap in lieu of articulated concrete block for the Drop Structure 4 spillway. <br />Modification directs a change in the -gradation re uirements for the riprap to be furnished under Modification No. 010 <br />Modification increases the funding limitation for Modification No. 013. <br />Modification directs a cattle guard and stock gates to be furnished and installed, an existing gate to be relocated, and shotcrete to <br />be installed on the rock slo a at the dam crest road. <br />Modification directed changes to the work directed under Modification No. 004. These changes added additional excavation for <br />the dump wall and added the Basin Creek waste fill area as a waste area for the stripped materials from Borrow Area B. <br />Modification definitizes the contract price adjustment for the changes directed under modification 012 <br />Modification definitizes the contract price adjustment for the changes directed under modification 011 <br />018 <br />02- Jul -04 <br />$ 40,000 <br />019 <br />020 <br />021 <br />09 -Au -04 <br />05- Nov-04 <br />05- Nov -04 <br />$ - <br />$ 1,231 <br />$ 1,026 <br />022 <br />27-Sep-04 <br />$ 419 785 <br />Modification directs work required to complete the La Plata River Restoration. The scope of work includes channel and floodplain <br />construction; boulder J- hooks; scour holes; bankfull channel bends and pools; boulder bank protection; and grade control <br />structure. <br />Modification definitizes the contract price adjustment for the changes directed under modification 022 <br />Modification definitizes the contract price adjustment for the changes directed under modification 024 <br />Modification directs the construction of an embankment buttress to stabilize rock slides on the left abutment foundation <br />excavation and improve the downstream and upstream foundation access ramps. <br />023 <br />024 <br />025 <br />16 -Dec-04 <br />01- Feb -05 <br />18- Jan -05 <br />$ - <br />$ 30,092 <br />$ 683,982 <br />026 1 <br />28 -Jan -05 <br />$ 700,000 includes <br />Modification directs the contractor to design and install an unwatering system for the dam foundation area. Scope of the work <br />providing unwaterna eauioment ditches <br />-- 1vunuvr0wI 01 u PI CGI ICdIIUM <br />