Laserfiche WebLink
Animas - La Plata Project <br />Tracking of Modifications <br />Contract No. 04 -NA-40 -8051 <br />Dam Foundation Excavation, Roads, and Drop Structures <br />Modification <br />Date <br />12- Mar -09 <br />Number <br />Executed <br />Amount <br />Description of Modification <br />Modification directs the construction of crossing drainage improvements along the powerline access trail. Scope of the work <br />027 <br />07- Feb-05 <br />$ 168,000 <br />includes furnishing and installing CMP , placina sloe protection and establishing connecting drainage ditches. <br />Modification incorporates the mobilization of grouting equipment to the site to allow for the commencement of foundation grouting <br />028 <br />25- Feb -05 <br />$ 413,101 <br />on A ril 1 2005. <br />Modification provides an equitable adjustment for the transmission replacement on a contractor owned Caterpillar 436 backhoe, <br />029 <br />25- Mar -05 <br />$ 6 484 <br />in accordance with the "Ma'or Equipment Re airs" provision of the contract. <br />030 <br />25- Mar -05 <br />$ - <br />Modification makes an administrative change in the cost accounting information. <br />031 <br />25 -Mar -05 <br />$ (6 ,404) <br />Modification definitizes the contract price adjustment for the changes directed under modifications 013 and 017. <br />032 <br />26-Apr-05 <br />$ 4,200 <br />Provide Boulder Bank Protection at La Plata River Restoration site to protect from extremely high flows in the river. <br />033 <br />06- Jun -05 <br />$ - <br />Obligate funds to contract. <br />034 <br />03-Au -05 <br />$ 15,000 <br />Modification provides for remediation of La Plata River Restoration Area due to high spring runoff. <br />035 <br />16-Au -05 <br />$ - <br />Obligate funds to contract. <br />036 <br />23-Sep-05 <br />$ (5,000) <br />Definitize Modification No. 002 for the colluvium slope stabilization work. <br />037 <br />23-Sep-05 <br />$ (16,800) <br />Definitize Modification No. 027 for the installation of drainage crossing improvements along the Dower line access road. <br />038 <br />23-Sep-05 <br />$ 22,789 <br />Definitize Modification No. 018 for the installation of cattle guards, stock gates, and shotcrete on the dam crest access road. <br />039 <br />23-Sep-05 <br />$ (213,982) <br />Definitize Modification No. 025 for the construction of an embankment buttress to stabilize rock slides on left abutment. <br />040 <br />13-Sep-05 <br />$ 343 980 <br />Undefnitized modification for increased fuel costs in accordance with the Fuel Escalation clause the <br />041 <br />2,3-Sep-05 <br />$ 178,144 <br />of sub'ect contract. <br />Undefinitized modification for proposal preparation costs in accordance with the re uirements of 93 -638. <br />042 <br />31 -Oct -05 <br />$ - <br />Obli ate funds to contract. <br />Definitize Modifications Nos. 32 and 34. Work provides for the installation of boulder bank protection to protect the La Plata <br />043 <br />30- Nov -05 <br />$ 4,600 <br />River Restoration Area from high spring runoff flows and to perform required remediation after the high flows receded. <br />044 <br />31-Aug-06 <br />$ - <br />Obli ate funds to contract. <br />045 <br />26 -Oct -06 <br />$ - <br />Obli ate funds to contract. <br />046 <br />07- Feb-07 <br />$ - <br />Obligate funds to contract. <br />047 <br />25-May-07 <br />$ - <br />Obligate funds to contract. <br />048 <br />02- <br />- <br />Obligate funds to contract. <br />049 <br />17 <br />- <br />Pa ment Address Chan e <br />050 <br />04 <br />- <br />Funding Obli adon FY10 <br />Total <br />