Laserfiche WebLink
Animas - La Plata Project <br />Tracking of Modifications <br />Contract No. 04 -NA-40 -8034 <br />2003 Construction Tasks - Ridges Basin Dam <br />Modification <br />Number <br />Date <br />Executed <br />Amount <br />i c- Mai -vy <br />Description of Modification <br />001 <br />19-Se -03 <br />$ 230,000 <br />Modification directs the installation of permanent power to the Ridges Basin Dam Outlet Works Control House. <br />002 <br />31- Oct -03 <br />$ 400,000 <br />Modification directs work required to provide for the care and diversion of Basin Creek. Scope includes constructing a cofferdam and outlet facilities; and <br />temporary diversion channel through the dam foundation area and Basin Creek Drop Structures 1-4 <br />003 <br />31- Oct -03 <br />$ 1,000,000 <br />Modification directs the construction of Drop Structures 1,2, and 3; improvement of gas line crossings; and compaction of waste fill in Basin Creek <br />Improvements upstream of Drop Structures 1,2, and 3. <br />004 <br />05- Jan -04 <br />$ 135,545 <br />Modification definitizes the contract price adjustment for the changes directed under modification 002 <br />005 <br />05- Jan -04 <br />$ 29,846 <br />Modification definitizes the contract price adjustment for the changes directed under modification 003 <br />006 <br />01 -Jun -04 <br />$ - <br />Modification directs the installation of ri rap in lieu of articulated concrete block on drop structures 1, 2, and 3. <br />007 <br />05- Jun -04 <br />$ 160,000 <br />Modification directs work required to provide for storm water controls downstream of the Basin Creek cofferdam. Scope includes following "Best <br />Management Practices ", constructing and maintaining diversions and repairing stormwater damage <br />008 <br />04-Au -04 <br />$ 130,000 <br />Modification directs changes to the drop structure stilling pools. Scope includes constructing approach and discharge transitions and constructing <br />permanent channel between drops 1 and 2 <br />009 <br />28-Sep-04 <br />$ 99,990 <br />Modification provides reimbursement for contractor costs incurred for consultant services for Borrow Area B analysis. <br />010 <br />06 -Ma -05 <br />$ - <br />Amend Scope of Mod. No. 001 to provide for installation of fiber optic in lieu of permanent electrical power. <br />011 <br />24- Jun -05 <br />$ 24,000 <br />Modification directs work required to furnish, install, and maintain a rock fall safety fence on the top of the right abutment. <br />012 <br />24- Jun -05 <br />$ - <br />Correct allocation of funding for contract. <br />013 <br />29 -Au -05 <br />$ 50,000 <br />Modification Provides payment for shaping of the right abutment and installation of rock bolts in the P7 sandstone unit. <br />014 <br />23-Se -05 <br />$ 23,000 <br />Undefinitized modification for proposal ereparation costs in accordance with the requirements of 93 -638. <br />015 <br />02- Mar -06 <br />$ 46,000 <br />Definitize Modifications Nos. 001/010 regarding the installation of fiber optic cable to Ridges Basin Dam. <br />016 <br />31- Jul -07 <br />$ - <br />Redirect Project funding to Contract (8064) <br />017 <br />17-Sep-08 <br />$ - <br />Payment Address Change <br />Total <br />$ 2,176,689 <br />