Laserfiche WebLink
Animas - La Plata Project <br />Tracking of Modifications <br />Contract No. 03 -NA -40 -8013 <br />Durango Pumping Plant, Stage 2 <br />Modification <br />Number <br />Date <br />Executed <br />Amount <br />12- Mar -09 <br />Description of Modification <br />060 <br />27- Feb-08 <br />Added channel bases to the floor mounted distributrion panels. <br />061 <br />062 <br />27- Feb-08 <br />27- Feb-08 <br />Revised design, and uiremtns for the HVAC system, due to actual equipment cifications. <br />Field adjustment for conflicts and adjustment to accommodate HVAC insallation. <br />063 <br />26-Mar-08 <br />Emergency lighting electrical box revisions. <br />064 <br />30-Apr-08 <br />0,35 <br />Provide temporary r to WAPA switchyard. <br />065 <br />29 Ma -OB <br />Add watersto to construction joints in suspended slab above the motor control <br />066 <br />8-Au <br />gallery. <br />Funding Obligation FY08 <br />067 <br />068 <br />17 -Se 8 <br />29-Se 8 <br />Pa ent Address Chan s <br />Additional Exposed Conduit and Cable <br />069 <br />070 <br />z9-Sep-o8 <br />30-Sep-08 <br />$ - <br />$ 98,000 <br />Funding Obligation FY08 <br />Site Work and Exterior ConduiUPullbox <br />071 <br />23 -Oct-08 <br />$ 119,176 <br />DA Rev to room 206, EG Room add). 2 -in conduit, providing temp power to WAPA switchyard, revision to exp & emb'ed piping, furnish and install liquid <br />i M flex metal conduit <br />072 <br />30 -Oa -08 <br />$ 2,505 <br />IF&I 71C #14 AWG between CCA & CHB <br />073 <br />30- Oct-08 <br />$ 1,000 <br />Provide flex conduit for wire in cable tray <br />074 <br />30. Oct -08 <br />$ 5,892 <br />Revisions to smoke detector installation in the discharge of NSAHUt <br />075 <br />076 <br />30- Oct-08 <br />23- Jan-09 <br />23- Jan-09 <br />$ 310 <br />$ 48,654 <br />$ 6,384 <br />Definitizes Mod #17, which revised therequirements for the HVAC ductwork ri id foam insulation <br />Definitize Mods 040 and 042, COD waterline Rev <br />Fire Alarm Revisions, Add'I Module, Position, Switches <br />077 <br />078 <br />079 <br />22- Jan-09 <br />23 -Jan-09 <br />23 -Jan-09 <br />27 -Jan -09 <br />10- Feb-09 <br />24- Feb-09 <br />17 -Mar -09 <br />30-Mar-09 <br />8-Apr-09 <br />17-Apr-09 <br />18-Ma -09 <br />21 -Ma -09 1 <br />24- Jun-09 1 <br />24- Jun-09 Is <br />15 -Jul -09 <br />4-Aug-09 <br />3-Sep-09 <br />16-Sep-09 <br />10 -Nov -09 <br />10- Deo-09 <br />4 -Dec-09 <br />17- Feb-10 <br />1 -A r -10 <br />21-Apr-10 <br />7- Jun -10 <br />10- Jun -10 <br />11- Jun-10 <br />16- Jun -10 <br />$ 11,700 <br />$ 9 344 <br />$ 14 920 <br />$ 655 <br />$ 298,030 <br />s 3,300 <br />$ 148,700 <br />$ 20,000 <br />$ 55,000 <br />$ 20,000 <br />$ 5,000 <br />$ 2,000 <br />$ 59,000 <br />1 340,000 <br />$ 2,700 <br />$ 19,321 <br />$ 5,600 <br />$ - <br />$ 128,066 <br />$ 655 <br />$ 47,000 <br />$ 1,500 <br />; 11,494 <br />$ 36,920 <br />; 9 335 <br />$ 82,549 <br />$ 4,290 <br />$ 61,886 <br />; 44,485 <br />; 10,886 <br />; 16,741 <br />Mechanical Seal Flowmeters <br />Revisions to Photoluminescent Com nents <br />CLA and CAA Control Board Revisions <br />Equipment su rt for sewerline subsurface investi ations <br />Revisions to the 72 -Inch Dischar a Line and Definitize Mod 034 <br />Increase limitation of Unilaterial Mod No. 078 <br />F &I Fencing and Gates less roundin and Crest Gate Inclimeter Improvement <br />Revision to duct, dam r, &lower for the EG radiator in the en ine enerator room <br />Construction Trailer Relocation Associated Infrastructure <br />Minor Elec. Ad'. Necessary for Commisionin <br />Removal of Sediment in Intake <br />Install Stop Logs to Crest Gates <br />Increase in Hot Bituminous Pavement Costs <br />Increase Funding due to VEO 85115% <br />Telephone conductor installation <br />'Grounding, Gate Power, Bollards for Access Ctl <br />Removal of Sediment in Intake <br />FY09 Funding Obligation <br />Escalation - Non -S Bus and Sta.Svc.Xfonner <br />Dig GeologV test pit. at the POF location <br />Crest Gate Air Su I and Bladder Modification <br />Mach Seal Service Water Tie <br />Deiinhize Mod 087 <br />Intake Structure Rakln - Regular Time <br />Intake Structure Rakin - OT/Holida <br />efinitize Mods 078 and 083 Flow Meter <br />[Air djustment to RS and GRS Conduit for Revisions <br />eletion of Telephone System and UO Cabinet <br />Com ressorRelocation <br />/C #16 Control Cable and Elev Room Rece tical <br />eTinitize Modification No. 021, SUSG Fuel Escalation <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />087 <br />088 <br />089 <br />090 <br />091 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />18- Jun -10 <br />107 <br />22-Jun -10 <br />108 <br />22- Jun-10 <br />Total <br />1 <br />$ 4,893,371 <br />