Animas - La Plata Project
<br />Tracking of Modifications
<br />Contract No. 03 -NA -40 -8013
<br />Durango Pumping Plant, Stage 2
<br />Modification
<br />Number
<br />Date
<br />Executed
<br />Amount
<br />12- Mar -09
<br />Description of Modification
<br />060
<br />27- Feb-08
<br />Added channel bases to the floor mounted distributrion panels.
<br />061
<br />062
<br />27- Feb-08
<br />27- Feb-08
<br />Revised design, and uiremtns for the HVAC system, due to actual equipment cifications.
<br />Field adjustment for conflicts and adjustment to accommodate HVAC insallation.
<br />063
<br />26-Mar-08
<br />Emergency lighting electrical box revisions.
<br />064
<br />30-Apr-08
<br />0,35
<br />Provide temporary r to WAPA switchyard.
<br />065
<br />29 Ma -OB
<br />Add watersto to construction joints in suspended slab above the motor control
<br />066
<br />8-Au
<br />gallery.
<br />Funding Obligation FY08
<br />067
<br />068
<br />17 -Se 8
<br />29-Se 8
<br />Pa ent Address Chan s
<br />Additional Exposed Conduit and Cable
<br />069
<br />070
<br />z9-Sep-o8
<br />30-Sep-08
<br />$ -
<br />$ 98,000
<br />Funding Obligation FY08
<br />Site Work and Exterior ConduiUPullbox
<br />071
<br />23 -Oct-08
<br />$ 119,176
<br />DA Rev to room 206, EG Room add). 2 -in conduit, providing temp power to WAPA switchyard, revision to exp & emb'ed piping, furnish and install liquid
<br />i M flex metal conduit
<br />072
<br />30 -Oa -08
<br />$ 2,505
<br />IF&I 71C #14 AWG between CCA & CHB
<br />073
<br />30- Oct-08
<br />$ 1,000
<br />Provide flex conduit for wire in cable tray
<br />074
<br />30. Oct -08
<br />$ 5,892
<br />Revisions to smoke detector installation in the discharge of NSAHUt
<br />075
<br />076
<br />30- Oct-08
<br />23- Jan-09
<br />23- Jan-09
<br />$ 310
<br />$ 48,654
<br />$ 6,384
<br />Definitizes Mod #17, which revised therequirements for the HVAC ductwork ri id foam insulation
<br />Definitize Mods 040 and 042, COD waterline Rev
<br />Fire Alarm Revisions, Add'I Module, Position, Switches
<br />077
<br />078
<br />079
<br />22- Jan-09
<br />23 -Jan-09
<br />23 -Jan-09
<br />27 -Jan -09
<br />10- Feb-09
<br />24- Feb-09
<br />17 -Mar -09
<br />30-Mar-09
<br />8-Apr-09
<br />17-Apr-09
<br />18-Ma -09
<br />21 -Ma -09 1
<br />24- Jun-09 1
<br />24- Jun-09 Is
<br />15 -Jul -09
<br />4-Aug-09
<br />3-Sep-09
<br />16-Sep-09
<br />10 -Nov -09
<br />10- Deo-09
<br />4 -Dec-09
<br />17- Feb-10
<br />1 -A r -10
<br />21-Apr-10
<br />7- Jun -10
<br />10- Jun -10
<br />11- Jun-10
<br />16- Jun -10
<br />$ 11,700
<br />$ 9 344
<br />$ 14 920
<br />$ 655
<br />$ 298,030
<br />s 3,300
<br />$ 148,700
<br />$ 20,000
<br />$ 55,000
<br />$ 20,000
<br />$ 5,000
<br />$ 2,000
<br />$ 59,000
<br />1 340,000
<br />$ 2,700
<br />$ 19,321
<br />$ 5,600
<br />$ -
<br />$ 128,066
<br />$ 655
<br />$ 47,000
<br />$ 1,500
<br />; 11,494
<br />$ 36,920
<br />; 9 335
<br />$ 82,549
<br />$ 4,290
<br />$ 61,886
<br />; 44,485
<br />; 10,886
<br />; 16,741
<br />Mechanical Seal Flowmeters
<br />Revisions to Photoluminescent Com nents
<br />CLA and CAA Control Board Revisions
<br />Equipment su rt for sewerline subsurface investi ations
<br />Revisions to the 72 -Inch Dischar a Line and Definitize Mod 034
<br />Increase limitation of Unilaterial Mod No. 078
<br />F &I Fencing and Gates less roundin and Crest Gate Inclimeter Improvement
<br />Revision to duct, dam r, &lower for the EG radiator in the en ine enerator room
<br />Construction Trailer Relocation Associated Infrastructure
<br />Minor Elec. Ad'. Necessary for Commisionin
<br />Removal of Sediment in Intake
<br />Install Stop Logs to Crest Gates
<br />Increase in Hot Bituminous Pavement Costs
<br />Increase Funding due to VEO 85115%
<br />Telephone conductor installation
<br />'Grounding, Gate Power, Bollards for Access Ctl
<br />Removal of Sediment in Intake
<br />FY09 Funding Obligation
<br />Escalation - Non -S Bus and Sta.Svc.Xfonner
<br />Dig GeologV test pit. at the POF location
<br />Crest Gate Air Su I and Bladder Modification
<br />Mach Seal Service Water Tie
<br />Deiinhize Mod 087
<br />Intake Structure Rakln - Regular Time
<br />Intake Structure Rakin - OT/Holida
<br />efinitize Mods 078 and 083 Flow Meter
<br />[Air djustment to RS and GRS Conduit for Revisions
<br />eletion of Telephone System and UO Cabinet
<br />Com ressorRelocation
<br />/C #16 Control Cable and Elev Room Rece tical
<br />eTinitize Modification No. 021, SUSG Fuel Escalation
<br />080
<br />081
<br />082
<br />083
<br />084
<br />085
<br />086
<br />087
<br />088
<br />089
<br />090
<br />091
<br />092
<br />093
<br />094
<br />095
<br />096
<br />097
<br />098
<br />099
<br />100
<br />101
<br />102
<br />103
<br />104
<br />105
<br />106
<br />18- Jun -10
<br />107
<br />22-Jun -10
<br />108
<br />22- Jun-10
<br />Total
<br />1
<br />$ 4,893,371