My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Tracking of Modifications 3/12/09
CWCB
>
ALP Project
>
Tracking of Modifications 3/12/09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 1:12:49 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas - La Plata Project <br />Tracking of Modifications <br />Contract No. 03 -NA -40 -8013 <br />Durango Pumping Plant, Stage 2 <br />Modification <br />Date <br />12- Mar-09 <br />Number <br />Executed <br />Amount <br />Description of Modification <br />Change Road Grade from 8% between Stations 10+00 to 18 +50 to 6 °. from Stations 3 +00 to 18 +50 to provide for safer access to the DPP and the batch <br />001 <br />19- Nov-04 <br />$ <br />plant pad. Adds excavation work and deletes embankment. Net impact is $0.00. <br />002 <br />2-May-05 <br />$ 1,081,000 <br />Provide Payment for standby costs at the SUSG Temporary Portable Batch Plant until commercial operations from the batch plant are approved <br />003 <br />24-Jun-05 <br />$ 153,842 <br />Defiinkize Mod. No. 2 <br />004 <br />14- Jun-05 <br />$ 94,736 <br />Furnish and Install 3/4 -Inch PVC and Rigid Steel RS Conduit <br />005 <br />17- Jun -05 <br />$ - <br />Obligate funds to contract. <br />006 <br />6- Jul -05 <br />$ - <br />Correct allocation of funding to contract. <br />007 <br />30-Aug-05 <br />$ 41,150 <br />Provide merit for City of Durango sewer and water to fees and meter. <br />008 <br />16-Sep-05 <br />$ <br />Obli ate funds to contract. <br />009 <br />23-Se "5 <br />$ 257,772 <br />Undefinitized Modification for proposal Preparation costs in accordance with the requirements of 93 -638. <br />010 <br />30-Se 05 <br />$ - <br />Obligate funds to contract. <br />011 <br />012 <br />25 -Oct-05 <br />$ <br />Undefinitized Modification to allow the use of Type 1 /II LA cement in lieu of Type V cement due to national shortage of Type V. <br />23 -Nov -05 <br />$ <br />U011 gate funds to contract. <br />Provides payment for labor, and laboratory testing required to meet the waste water monitoring requirements of the specifications. Costs for this work <br />013 <br />21 -Dec-05 <br />$ 16,666 <br />was <br />inadvertently left out of the the original contract negotiations. <br />014 <br />3- Feb-06 <br />$ 5,000 <br />Provides payment for work required to prepare a site for a new Government office trailer at the pumping plant site. <br />015 <br />22- Mar-06 <br />$ 5,600 <br />Provides for installation of rock berms in the Animas River to adjust the flow characteristics around and adjacent to the Fish Outfall Structure. <br />016 <br />16-Apr-06 <br />$ - <br />Coned Accounting Data <br />017 <br />19- Jun-06 <br />$ 4,000 <br />Provides for a revision of the insulation details for the exterior of embedded ductwork. <br />Correct the specification requirements for the geonet material to be installed above the pervious backfill material. <br />018 <br />22 -Jun -06 <br />$ 6,400 <br />019 <br />26 -Jun-06 <br />$ 11,400 <br />Increase the estimated value of Modification No. 018 for the geonat material. <br />020 <br />021 <br />25-Jul 06 <br />$ 8,602 <br />Definitize Modification No. 014 to provide payment for work required to prepare a site for a new Government office trailer at the pumping plant site. <br />13- Jul-06 <br />$ 215,400 <br />Implement the rovisions of the fuel escalation clause in the contract for SUSG. <br />022 <br />14 Jul 06 <br />$ 22,000 <br />Direct additional excavation for the City of Durango Air Chamber foundation. Corrects conflict between Sta e 1 and Stage 2 contract documents. <br />023 <br />29-Aug-06 <br />$ - <br />Administrative modification to correct accounting data in Modification No. 022. <br />024 <br />__20-Sep-06 <br />$ <br />Obligate funds to contract. <br />025 <br />20- Sep-06 <br />$ 27,000 <br />Undefintized Modification to provide payment for additional excavation and backfill required for installation of the segmental retaining wall in the pumping <br />)ant service Yard. Retaining wall is contractor designed and specific requirements for excavation were not known at the time the bid was <br />026 <br />27-Sep-06 <br />$ <br />prepared. <br />Obligate funds to contract. <br />027 <br />28-Se <br />$ <br />Obligate funds to contract. <br />028 <br />26 -Oct-06 <br />$ <br />funds to contract. <br />029 <br />2- Nov-06 <br />$ <br />-Obligate <br />Obligate funds to contract. <br />Definitize Modification No. 025 for additional excavation and backfill required for installation of the segmental retaining wall in the service <br />030 <br />22- Nov-06 <br />$ 57,726 <br />yard. pumping plant <br />031 <br />29- Nov-06 <br />$ <br />Obli ate funds to contract. <br />032 <br />15 -Dec- <br />$ - <br />Obligate funds to contract. <br />033 <br />19 -Jan-07 <br />$ 50,343 <br />Furnish and Install Additional Electrical Conduits <br />034 <br />23 -Jan-07 <br />$ 110,000 <br />Durango Discharge Line Backfill Concrete <br />035 <br />151-Feb-07 <br />$ - <br />Milestone 1 - Switch and Extension <br />036 <br />26-Feb-07 <br />$ 99,190 <br />Fumish and Install Electrical Wire and Cable <br />037 <br />21 -Mar -07 <br />$ 2,615 <br />Difinitize Modification No. 15 and Reiocate Eddy <br />038 <br />20 -Mar -07 <br />$ <br />—Obligate funds to contract. <br />039 <br />20-Apr-07 <br />$ 13 113 <br />Minor Electrical Revisions <br />040 <br />24-Apr-07 <br />$ 10,000 <br />ALstments to the COD Waterline <br />041 <br />7- Jun -07 <br />$ 32 373 <br />Chan es the radio desi n of the DPP site, adds stonnwater draina e i in <br />042 <br />8 -Jun 07 <br />$ 5,000 <br />. <br />Provides for rock excavatio required for the installation of the COD discha e i <br />043 <br />24 -Jul -07 <br />$ 32,373 <br />. <br />Revised grading directed under Mod #041 <br />044 <br />1 -Au -07 <br />$ <br />Obligate funds to contract. <br />045 <br />5-Se "7 <br />19-Se 7 <br />26-Sep-07 <br />26-Se 07 <br />28 Se 7 <br />$ <br />$ 1,718 <br />$ 170,000 <br />$ - <br />$ <br />Obligate funds to contract. <br />Motor Operated Overhead Door Revisions <br />Switch ear Desi n Revisions <br />Obli ate funds to contract. <br />Obli ate funds to contract. <br />046 <br />047 <br />048 <br />049 <br />050 <br />17 -Oct -07 <br />$ <br />Definitize Mod #047 <br />051 <br />10- Dec-07 <br />$ (632.1861 <br />$ - <br />$ <br />Reduces the contract value and closes the bid item for reimbursement of standby costs to SUSG for the temporary ratble batch plant. <br />Obli ate funds to contract. <br />Obligate funds to contract. <br />052 <br />2 -Nov -07 <br />053 <br />9 -Nov -07 <br />054 <br />5 -Dec-07 <br />10 Dec 07 <br />$ <br />$ <br />Obli ate funds to contract. <br />ON ate funds to contract. <br />055 <br />056 <br />5- Jan-08 <br />$ 4,392 <br />$ 30 651 <br />Provide aluminum ramR for electrical ul , and additional disconnect switches. <br />Revised the channel bases beneath electrical gear for additional suuport. and galvanizing. <br />057 <br />-Jan -08 <br />058 <br />25- Feb-08 <br />27- Feb-08 <br />$ <br />$ 29,028 <br />Obli a fun contract. <br />Revised door uirements for card readers and magnetic switches and than ed #110 to bullet resistant. Security requirements. <br />059 <br />
The URL can be used to link to this page
Your browser does not support the video tag.