Laserfiche WebLink
Animas -La Plata Project <br />Feb 13, 2013 Draft Transfer Inspection Report <br />IV. Maintenance History <br />During the period since the Project has been operational and the initial filling of Lake Nighthorse <br />completed, the resources of FCCO and the Association have been utilized to perform maintenance, <br />operation, modification, and repair activities. These activities have required significant cooperation in <br />order to ensure that the Project features are being properly maintained and are fully operational. <br />Throughout this process, WCAO has been involved in maintenance and operational decisions, as well as <br />assisting in the transfer process. <br />�ypEPA,iI <br />INW4 <br />U.S. Department of the Interior <br />Bureau of Reclamation <br />