My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP Transfer Inspection Report
CWCB
>
ALP Project
>
ALP Transfer Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 1:00:51 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas -La Plata Project <br />Feb 13, 2013 Draft Transfer Inspection Report <br />IV. Maintenance History <br />During the period since the Project has been operational and the initial filling of Lake Nighthorse <br />completed, the resources of FCCO and the Association have been utilized to perform maintenance, <br />operation, modification, and repair activities. These activities have required significant cooperation in <br />order to ensure that the Project features are being properly maintained and are fully operational. <br />Throughout this process, WCAO has been involved in maintenance and operational decisions, as well as <br />assisting in the transfer process. <br />�ypEPA,iI <br />INW4 <br />U.S. Department of the Interior <br />Bureau of Reclamation <br />
The URL can be used to link to this page
Your browser does not support the video tag.