My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ALP Transfer Inspection Report
CWCB
>
ALP Project
>
ALP Transfer Inspection Report
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 1:00:51 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas -La Plata Project <br />Feb 13, 2013 Draft Transfer Inspection Report <br />III. Construction Specifications <br />Pursuant to Public Law 93 -638, the Indian Self- Determination, Education, And Assistance Act (PL -638), <br />most of Ridges Basin Dam construction was delegated to the Ute Mountain Ute's construction arm, <br />Weeminuche Construction Authority (WCA). "Batched" materials (primarily concrete) were also <br />subcontracted by WCA to Sky Ute Sand and Gravel, a company owned by the Southern Ute Indian Tribe. <br />A. Ridges Basin Dam <br />Due to the Project -wide critical path that required consideration of all Project features <br />and allocations from Reclamation's annual budget to the Project, six construction contracts <br />were issued to build Ridges Basin Dam. These contracts are listed below: <br />Contract <br />Notice to Proceed <br />Primary items of work <br />03 -NA -40 -8750 <br />27 NOV 02 <br />Ridges Basin Dam Outlet Works Excavation <br />03 -NA -40 -8034 <br />09 SEP 03 <br />2003 Construction Tasks <br />04 -NA -40 -8051 <br />22 OCT 03 <br />Dam Excavation, Roads and Drop Structures <br />04 -NA -40 -8054 <br />16 SEP 04 <br />Outlet Works Tunnel Excavation <br />04 -NA -40 -8058 <br />09 JUL 04 <br />Ridges Basin Dam Material Processing Plant <br />05 -NA -40 -8064 <br />14 MAR 04 <br />Ridges Basin Dam Completion <br />B. Ridges Basin Inlet Conduit <br />In preparation for the relocation of three gas pipelines around the reservoir area, an 84" <br />diameter CMP casing pipe was installed in preparation for the 72" diameter Ridges Basin <br />Inlet Conduit. Ridges Basin Inlet Conduit was constructed under the following contracts: <br />Contract Notice to Proceed Primary items of work <br />02 -NA -40 -6950 17 JUN 02 Stage I, Install 84" diameter CMP <br />06 -NA -40 -8137 24 MAR 04 Ridges Basin Inlet Conduit <br />C. Durango Pumping Plant <br />The Durango Pumping Plant was constructed in two stages under the following contracts: <br />Contract Notice to Proceed Primary items of work <br />03 -NA -40 -8008 4 APR 03 Durango Pumping Plant Stage 1 <br />03 -NA -40 -8013 9 AUG 04 Durango Pumping Plant Stage 2 <br />U�au�eT ExTa �ixry�q <br />U.S. Department of the Interior <br />Bureau of Reclamation <br />
The URL can be used to link to this page
Your browser does not support the video tag.