Laserfiche WebLink
Animas -La Plata Project <br />Feb 13, 2013 Draft Transfer Inspection Report <br />TRANSFER ISSUE <br />STIPULATION <br />Labels do not match those <br />Reclamation will install a disconnect switch, to allow for testing <br />in the Standing Operating <br />Reclamation will label the ACP to match the SOP. <br />Procedures (SOP) <br />that the dam outlet works will function using the generator set. <br />9. Motor Control Panel <br />The 480 volts, 3 -phase motor control center provides magnetic motor starters for the HPU, <br />sleeve valve, 48" and 36" butterfly valves and the tunnel ventilation system. Breakers are <br />also provided for security gate, building heaters, power receptacles, control room <br />ventilation, and transformer to 120 volt power and loads. <br />TRANSFER ISSUE I STIPULATION <br />Need ArcFlash labels I Labeling will be completed by Reclamation. <br />10. HPU oil pumps (MO -1 and MO -2) controls <br />Two across - the -line magnetic contactors located in the motor control center start the pump <br />motors. Separate 120 -volt control power transformers provides the control power and <br />service is determined by selector switch setting at the ACP. <br />D. Other Dam Appurtenances <br />1. Engine- Generator Set and Automatic Transfer Switch <br />A liquefied petroleum gas (LPG) engine - generator set (Cummins /Onan Model GGKB) is to <br />provide standby power for the Ridges Basin Outlet Works equipment. The set will provide a <br />continuous electric output of not less than 125 kilowatts (156 kVA at 0.8 power factor) at <br />480/227 volts, three phase, and 60 hertz. The engine - generator set is an indoor stationary <br />unit, complete with engine, cooling system, fuel components, starting system, supervisory <br />and control equipment, vibration isolators, generator, excitation and voltage regulation <br />system, and exhaust systems. <br />The engine - generator is connected to the motor control center (MCC), therefore all systems <br />in the control room, gate /valve room, and gate chamber are connected to this auxiliary <br />power system. <br />TRANSFER ISSUE <br />STIPULATION <br />Reclamation will install a disconnect switch, to allow for testing <br />There is no disconnect <br />the generator set under load. A test will be conducted to ensure <br />switch available for testing <br />that the dam outlet works will function using the generator set. <br />2. Stilling Basin Well Sump Pumping Unit <br />The configuration and layout of the electrically operated stilling basin well sump pumping <br />unit, located in the outlet works control house stilling basin well, was designed to evacuate <br />the well of any seepage or drainage water that could accumulate in the stilling well when <br />the outlet works sleeve valve is not being used. The pumping unit discharge is connected to <br />corrosion - resistant piping that is routed to the outlet works chute for disposal of the waste <br />water. <br />Transferred Works Inspection 8 Animas -La Plata Project <br />