My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Animas-La Plata Operation, Maintenance, & Replacement Association Meeting Minutes 7/7/10
CWCB
>
ALP Project
>
Animas-La Plata Operation, Maintenance, & Replacement Association Meeting Minutes 7/7/10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 12:28:57 PM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No. 09 -SLC -0645 <br />Procedures, shall contact Western's Energy Management and Marketing Office in <br />Montrose, Colorado, to arrange for the needed power. The Contractor will be billed for <br />the full cost of the power purchased and for any costs Western may incur in making the <br />purchase in the next monthly bill. <br />9. SCHEDULING, ACCOUNTING, AND BILLING PROCEDURES <br />9.1 Written Scheduling, Accounting, and Billing Procedures, hereinafter called <br />Procedures, shall be developed and agreed upon by the authorized representatives <br />of the Parties by the date of initial service under this Contract. The Procedures <br />are intended to implement the terms of this Contract but not to modify or amend it <br />and are, therefore, subordinate to this Contract. <br />9.2 In the event the Contractor fails or refuses to execute the initial Procedures or any <br />revised Procedures which Western determines to be necessary due to changes in <br />this Contract or the power system of either party, Western will temporarily <br />implement essential Procedures as determined by the Contracting Officer until <br />mutually acceptable Procedures have been developed and executed by the <br />authorized representatives of the parties as designated in Section 15 herein. <br />10. POWER FACTOR <br />10.1 The Contractor will be expected to maintain the power factor specified in the <br />attached rate schedule and the GPCP referenced in Section 12 below. If the <br />applicable power factor standard is not complied with, Western may, after giving <br />the Contractor ninety (90) days to correct the condition or such additional time as <br />E <br />
The URL can be used to link to this page
Your browser does not support the video tag.