Laserfiche WebLink
Contract No. 09 -SLC -0645 <br />warranted by the circumstances, make delivery system improvements associated <br />with power factor correction at the Contractor's expense to Western's system or <br />the Contractor's system with the agreement of the Contractor. If Western is <br />required to pay for delivery system improvements associated with power factor <br />correction on the system of its transmission agents, which are attributable to <br />conditions on the system of the Contractor, the Contractor shall pay for the cost of <br />such improvements. <br />10.2 If the power factor requirements under applicable rate schedule and the GPCP are <br />not the same, the more stringent will apply. <br />11. INTEGRATED RESOURCE PLANS AND SMALL CUSTOMER PLANS <br />11.1 The Contractor shall comply with the IRP or Small Customer Plan requirements, <br />as applicable, in accordance with the Program. <br />11.2 Western shall administer the IRP or Small Customer Plan requirements, as <br />applicable, in accordance with the Program. <br />11.3 Failure to comply with the IRP or Small Customer Plan requirements, after <br />exhausting all appeals, will result in the application of penalties as specified in the <br />Program. <br />11.4 In the event that Western, or any succeeding agency, shall promulgate change to <br />the IRP or Small Customer Plan portion of the Program following its initial <br />10 <br />