Laserfiche WebLink
3/12009 A -LP OM &R COST ESTIMATE* <br />INITIAL OPERATION - 2012 <br />2012 Startup <br />Unit Amount 2012 per unit Index Factor <br />Annual rental Cost <br />Purchase Cost - 31162009 <br />FIXED COSTS <br />EQUIPMENT - needed <br />' 3 Pickups, 3/4 ton miles 20,000 0.48 <br />1.00 <br />$9,600 <br />$60,000 <br />Truck w /crane, welder, light Plant hrs 200 75.00 <br />' <br />1.00 <br />$15,000 <br />PortableAir Compressor, 150 dm hrs 200 7.30 <br />' <br />1.00 <br />$1,460 <br />$28,000 <br />Work Boat hrs 100 22.50 <br />1.00 <br />$2,250 <br />$17,000 <br />' Portable Water Pump hrs 150 5.63 <br />1.00 <br />$845 <br />$27,000 <br />Misc. rented specialized equipment Is <br />$10,000 <br />' Skid Steer Loader hrs 120 40.25 <br />' <br />1.00 <br />$4,830 <br />$30,000 <br />Tractor /Mower hrs 120 50.00 <br />1.00 <br />$6,000 <br />$40,000 <br />Hydraulic Excavator hrs 80 100.00 <br />1.00 <br />$8,000 <br />Maintainer hrs 60 100.00 <br />1.00 <br />$6,000 <br />Front End Loader hrs 40 100.00 <br />1.00 <br />$4,000 <br />' Backhoe hrs 40 100.00 <br />' <br />1.00 <br />$4,000 <br />$60,000 <br />Hydraulic Carl hrs 24 <br />1.00 <br />$5,000 <br />Dump truck, 10 yd3 hrs 100 100.00 <br />1.00 <br />$10,000 <br />$90,000 <br />Fuel <br />$10,000 <br />Equipment Replacement & Major Repairs mo 1,000 <br />$12,000 <br />' Suggested to be provided by Reclamation upon transfer - rental costs are shown but not included in total <br />TOTAL EQUIPMENT COSTS <br />$75,000 <br />PERSONNEL <br />Manager <br />$80,000 <br />Secretary <br />$30,000 <br />Mech/Elec <br />$50,000 <br />Maintenanceman <br />$45,000 <br />Contract Electrician <br />$10,000 <br />Benefit 50% <br />$107,500 <br />TOTAL PERSONNEL COSTS <br />$323,000 <br />DAM AND PUMPING PLANT <br />Supplies yr 16,000 <br />1.00 <br />$16,000 <br />Emergency Reserve Fund mo 5,000 <br />1.00 <br />$60,000 <br />Replacement Reserve Fund mo 4,000 <br />1.00 <br />$48,000 <br />"Pumping Power to Replace Evaporation losses 2700 of <br />$40,000 <br />TOTAL COSTS <br />$124,000 <br />O &M BUILDING <br />Supplies + maintenance yr 5,000.00 <br />5,000.00 <br />Ullilities yr 10,000.00 <br />10,000.00 <br />Misc yr 10,000.00 <br />10,000.00 <br />SCADA yr 10,000.00 <br />10,000.00 <br />TOTAL O &M BUILDING COSTS <br />$35,000 <br />GENERAL UNLISTED OPERATING EXPENSE @ 10% (w /o power) <br />$46,200 <br />TOTAL FIXED COSTS <br />$610,000 <br />VARIABLE COSTS <br />POWER COSTS (assume no Ute water is delivered /pumped)(pumps exercised annually - includes <br />5000 of total to reservoir) "'• <br />$90,000 <br />(If power is paid based on 6 mos peak - cost is $150,000) <br />TOTAL VARIABLE COSTS <br />$90,000 <br />TOTAL ANNUAL COSTS <br />$700,000 <br />Note; Estimated costs are based on similar operations - more detailed costs can be obtained after several years of operations and <br />completion of Project DOC's. <br />" Power Costs based on WAPA Rate Schedule SLIP -F8 <br />"- Calculated as Total Opllmimd Pumping Cost minus Pumping COWS for Ule WalW (minus $40k for evep pumping) prom 51222007 Memo from PPsge to POC -FG) <br />