Laserfiche WebLink
FIXED CO <br />EQUIPMENT <br />Suggested td <br />PERSONNEL I <br />DAM AND PUMP <br />O &M BUILDING <br />GENERAL <br />VARIABLE <br />3/1/2009 A -LP OM &R COST ESTIMATE* <br />FULL OPERATION <br />2012 Startup <br />Unit Amount 2012 per unit Index Factor <br />3 Pickups, 3/4 ton miles 20,000 <br />Truck w /crane, welder, light Plant <br />hrs <br />200 <br />PortableAir Compressor, 150 cfm <br />hrs <br />200 <br />Work Boat <br />hrs <br />100 <br />Portable Water Pump <br />hrs <br />150 <br />Misc. rented specialized equipment <br />Is <br />Skid Steer Loader <br />hrs <br />120 <br />Tractor /Mower <br />hrs <br />120 <br />Hydraulic Excavator <br />hrs <br />120 <br />Maintainer <br />hrs <br />60 <br />Front End Loader <br />hrs <br />40 <br />Backhoe <br />hrs <br />40 <br />Hydraulic Cart <br />hrs <br />24 <br />Dump truck, 10 yd3 <br />hrs <br />100 <br />Fuel <br />Equipment Replacement & Major Repaint <br />mo <br />1,000 <br />be provided by Reclamation upon transfer - rental costs are shown but not included in total <br />TOTAL EQUIPMENT COSTS <br />Manager <br />Secretary <br />Mech /Elect <br />Malntenanceman <br />Maintenanceman <br />Contract Electrician <br />Benefit 50% <br />TOTAL PERSONNEL COSTS <br />ING PLANT <br />Supplies + maintenance yr <br />Emergency Reserve Fund mo <br />Replacement Reserve Fund mo <br />Pumping Power to Replace Evaporation losses 2700 of <br />TOTAL COSTS <br />0.48 <br />75.00 <br />7.30 <br />22.50 <br />5.63 <br />40.25 <br />50.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />100.00 <br />16,000 <br />5,000 <br />4,000 <br />Supplies yr 5,000.00 <br />Utlilities yr 10,000.00 <br />Misc yr ' 10,000.00 <br />SCADA yr 10,000.00 <br />TOTAL O &M BUILDING COSTS <br />OPERATING EXPENSE @ 10% (w /o power) <br />TOTAL FIXED COSTS <br />i <br />POWER COSTS (assumes FSEIS configuration)'• *• <br />(6 mos peak power charge vs monthly power peak does not affect this amount) <br />TOTAL VARIABLE COSTS <br />TOTAL ANNUf L COSTS <br />Power Costs tom 5/2212007 Memo from PPage to POC -FG - FSEIS Configuration <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />Annual Rental Cost <br />$9,600 <br />$15,000 <br />$1,460 <br />$2,250 <br />$845 <br />$10,000 <br />$4,830 <br />$6,000 <br />$12,000 <br />$6,000 <br />$4,000 <br />$4,000 <br />$10,000 <br />$10,000 <br />$12,000 <br />$79,000 <br />$80,000 <br />$30,000 <br />$50,000 <br />$45,000 <br />$45,000 <br />$10,000 <br />$130,000 <br />$390,000 <br />$16,000 <br />$60,000 <br />$48,000 <br />$40,000 <br />$124,000 <br />5,000.00 <br />10,000.00 <br />10,000.00 <br />10,000.00 <br />$35,000 <br />$54,900 <br />$1380,000 <br />$1,454,000 <br />$1,454,000 <br />$2,134,000 <br />