My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Water Supply and Demand Study 1/13/11
CWCB
>
ALP Project
>
Water Supply and Demand Study 1/13/11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2016 1:49:02 PM
Creation date
4/2/2013 11:22:24 AM
Metadata
Fields
Template:
Animas La Plata Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
181
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Animas -La Plata Water Marketing Supply and Demand Study <br />APPENDIX B <br />ESTIMATED ANNUAL OM &R COSTS <br />The two tables contained herein show the estimated annual Fixed OM &R and Variable OM &R costs <br />for the Animas -La Plata Project at start up ( "initial operation ") and when the project is considered <br />fully operational ( "full operation "). These are the U.S. Bureau of Reclamation's most recent estimate <br />of the annual OM &R costs. These estimates were shared with Animas -La Plata Operations <br />Committee (POC) in 2009 and are presently being reviewed by Mr. Russell Howard, ALP OM &R <br />Association General Manager. Mr. Howard, pending completion of his review, felt these estimates <br />were appropriate for planning purposes and the preparation of this report. We want to emphasize <br />these are estimates only and will change and be updated as actual operating experience is gained. <br />However, these are the best estimates currently available. <br />B -1 <br />ALP APPENDIX B INTRO 1_13_11.docx <br />
The URL can be used to link to this page
Your browser does not support the video tag.