I ALPOM &R Association <br />January 7, 2013 Board Meeting Minutes <br />(01/25/13 — Draft) <br />7. Staff Report <br />Russ gave a power point presentation to the group covering the required maintenance which will be utilized to <br />maintain the capabilities of the project. He informed the group that over the last several years we are much closer <br />to developing a maintenance program and have a much better idea of the core skills which will be needed. He <br />explained the four categories; routine and non - routine, critical and non - critical, to the group and the types of core <br />skills which will be needed. He informed the group of the items which are critical such as, pumping plant <br />equipment maintenance, Ridges Basin Dam Inspection and PM's, POF Equipment PM's, Security Fence Repair, <br />Right of Way Fence Repair, Plant Operations, Dam Operations, RBIC Conduit Maintenance and Repair, Electrical <br />and Mechanical Repairs, Tribute Garden maintenance, Basin Creek maintenance, asset modifications (small scale) <br />and Snow Removal. He indicated in the Power Point presentation which tasks could be contracted -out, as well as <br />the tasks which are contracted out presently. <br />Russ gave the group an overview of the MMS system and how it was developed. He gave examples of how the <br />system was set up and how it works as well as how costs are assigned and tracked for each system. Russ gave <br />examples of tracking costs using this system and gave examples of how a business decision could be made to <br />determine the best and most economical way to resolve re- occurring problems. Russ covered the three basic <br />approaches to maintenance, which are: Predictive Maintenance (tools such as thermography, oil samples, <br />vibrations monitoring, etc.), Preventative Maintenance (time based) and Run to Fail (replace item). Russ stated <br />we would use all three methods depending upon the criticality of the piece of equipment being serviced. <br />Russ informed the Board we have developed a MMS program of all the equipment (assets) on the project and <br />reviewed the hours required to accomplish the maintenance of electrical and mechanical equipment. He <br />reviewed the man hour figures and informed the group we will need additional manpower to accomplish the PM <br />program to keep a well maintained and functional water delivery system to the Association's member entities. <br />Russ reviewed the Labor Distribution Chart with the members. Russ pointed out currently there is a man hour <br />shortage to complete the PM program for the equipment. Russ reviewed the manpower figures and percentages <br />and explained how they will change as time goes on. He recommended hiring an additional electrician and <br />mechanic. Russ stated when Tom retires he will hire an additional Maintenance Technician to replace him. The <br />Technician will also have a CDL driver's license so they can operate the project dump truck. <br />Russ reviewed the budget for Water Year 2013 thru 2016. He reviewed the categories and the line items and <br />explained each one. The categories listed were: Staff, Reserve Funds, Materials and Supplies, Other Expenses, <br />Commercial Services, Professional Services, Utilities, WAPA Power, and Insurance. He reviewed each one and the <br />total costs for each member entity. Russ reminded the group these were accurate numbers and also pointed out <br />the original budget was very close to being accurate since we did not have any real numbers when that was <br />generated. Russ also reviewed "Additional Items to Add ". He explained some of the current systems such as the <br />phone system are extremely complicated and there are no local representatives that have the technical expertise <br />to repair this system. He said we will reduce some of these expenses as time goes along by using simpler systems <br />which have local representatives available when needed. Russ said we will continue to track all costs so he can <br />give the Board a more accurate financial picture in the future. Randy asked when Russ would get the additional <br />personnel he wanted. Russ said as soon as possible. <br />Mike asked Russ if it were alright if he shared this budget information with his future clients. Russ agreed it was <br />OK. There was some discussion concerning the timing of the budget start date and the start dates of the various <br />members. It is contingent on when USBR will transfer the Project from construction to O &M and to whom it will <br />be transferred to at that time. <br />Carly gave an update on filing the Association's taxes for this year. The requirements have changed and a Form <br />990 must be filed (12 pages). This will be filed on February 15, 2013. The completed form will be in the February 4 <br />meeting packet for the Board members review. <br />Page 2 <br />