My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150227 Contract
CWCB
>
Grants
>
DayForward
>
C150227 Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2013 7:41:43 AM
Creation date
3/26/2013 1:16:26 PM
Metadata
Fields
Template:
Grants
Applicant
South Platte Ditch Company
Grant Type
Non-Reimbursable
Fiscal Year (i.e. 2008)
2006
Project Name
Canal Modernization and Radio Telemetry Demonstration Project
CWCB Section
Finance
Contract/PO #
C150227
Grants - Doc Type
Contract/Purchase Order
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
enable interested parties to be updated on progress of the project. A Project Final <br />Report will be prepared in Phase 111. This report will be made available in electronic <br />format from the U.S. Bureau of Reclamation's Hydraulics Investigations Group website. <br />At the conclusion of Phases I and 11, an interim review will be performed and details of <br />upcoming tasks will be refined to reflect knowledge gained through efforts completed to <br />date. A memo documenting these interim reviews will be provided to CWCB <br />representatives. As may be seen in the Project Schedule, there will be some overlap in <br />the duration of some of the tasks grouped under different project phases. <br />Phase I Tasks Monitoring & Base Station Setup <br />1. Install stage- discharge recorders at flumes on the J &E SH recharge sites <br />2. Construct new flume at SPDC G2 Sandhill ditch site (to replace excessively <br />submerged flume) <br />3. Install radio /control units at SPDC office and recharge sites <br />4. Install radio /control units on first group J &E SH wells (4 wells) <br />5. Install radio /control units @ J &E SH (FLG) recharge pond and office <br />6. Install radio /control unit @ DWR designated site <br />7. Link the radio /control unit at the SPDC upper flume site with the nearby <br />(Kautz) lift pump <br />8. Begin development and testing of data processing system in spreadsheet <br />environment (and installation on SPDC and J &E SH office units) <br />9. Organize and host field day <br />10. Conduct and document an interim project review: self assessment and report <br />to CWCB and Division One Colorado Department of Water Resources <br />(CDWR) office <br />Phase ll Tasks Monitoring & Control <br />1. Motorize gates on SPDC spillway check structure near the diversion <br />measurement flume and automate structure to maintain target flow at the <br />flume <br />2. Install a long- throated flume in an existing rectangular concrete section at the <br />entrance to Smith #3 pond on SPDC recharge system to replace check -weir <br />measurement <br />3. Install sharp - crested weir blades on the existing check -weir at the entrance to <br />the Sandhill pond on the SPDC recharge system <br />4. " *Install radio units on 2nd group of J &E SH wells (3 wells) <br />5. Install radio /controls unit @ 2 SPDC company lateral flumes. One at the <br />upper end flume location and one at the (Albrandt) flume near the lower end <br />of the lateral. <br />6. Continued development of spreadsheet -based data management tool <br />7. Organize and host second annual field day <br />8. Conduct and document an interim project review: self assessment and report <br />to CWCB and Division One CDWR office <br />Appendix B to Grant Contract No. C150227 <br />Page 2 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.