Laserfiche WebLink
3.9 Perform a preliminary screening to eliminate less favorable surface water storage <br />plan elements. <br />3.10 Present initial findings and conclusions to the Technical Advisory Committee. <br />Task 4 Reconnaissance -Level Analvsis of Preliminary Alternatives <br />Surface water storage sites to be further screened under this Task 4 will be selected in <br />conjunction with the Technical Advisory Committee based upon the findings from Task 3. <br />4.1 Evaluate in further detail, the capacities and operational characteristics of each <br />potential reservoir site and conveyance facilities. <br />4.2 Evaluate possible combinations of surface water storage plan elements including <br />existing and potential facilities. <br />4.3 For each alternative: <br />Evaluate storable or divertable flows. <br />Estimate project yields. <br />The Consultants primary responsibility will be evaluation of inflow and surface <br />storage capacity. The demand analysis and beneficial uses will be defined in general <br />terms. The Technical Advisory Committee will provide information to the <br />Consultant as necessary to assist in the evaluation of alternatives. <br />Identify land ownership and right -of way considerations. <br />Prepare reconnaissance -level cost estimates. <br />Prepare a preliminary evaluation of monetary and non - monetary costs and <br />benefits. <br />DRAFT FINAL - September 2000 8 <br />