My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reconnaissance Level Study
CWCB
>
Water Supply Protection
>
DayForward
>
8001-9000
>
Reconnaissance Level Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2017 1:39:11 PM
Creation date
2/7/2013 3:54:50 PM
Metadata
Fields
Template:
Water Supply Protection
Description
related to PRRIP
State
CO
NE
WY
Basin
South Platte
North Platte
Water Division
1
Date
9/1/2001
Author
CWCB
Title
Platte Water Management and Storage Sites - September 2001 Information Sheet (PDA-104V)
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 3 - Identify Structural and Non - Structural Plan Elements <br />For each reservoir site identified in the following subtasks summarize preliminary general <br />information regarding sizing /capacity, a description of the required system components, and <br />conceptual operations. A base map showing the location of the proposed facilities should be <br />included. Significant issues or fatal flaws (i.e., technical, legal, permitting etc.) should be <br />identified and documented. In addition, the option of filling surface storage sites via ground <br />water pumping should be considered to ensure that all favorable physical sites are evaluated. <br />3.1 Conduct an inventory of reservoir sites that have been identified in previous studies. <br />3.2 Identify potential reservoir sites not evaluated in previous studies. <br />3.3 Identify potential opportunities for expansion/enlargement of existing storage sites <br />within the study area. <br />3.4 Identify any necessary conveyance or pumping elements for identified surface water <br />storage sites. <br />3.5 Identify non - structural plan elements, which could be used in conjunction with or to <br />enhance the yield of identified reservoir sites. <br />A basic review of non - structural water management opportunities should be <br />completed. Particular attention should be given to opportunities that may be realized <br />if institutional/operational plans are modified for existing facilities. <br />3.6 Perform a field reconnaissance of each site. <br />3.7 Identify potential operational relationships between surface water storage plan <br />elements including existing facilities. <br />3.8 Perform a preliminary analysis of surface water storage plan elements to include the <br />ability to meet the Study objective and potential implementation problems. <br />DRAFT FINAL - September 2000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.