Laserfiche WebLink
TABLE 8.G.79 <br />Alternatives Yield and Cost by Reach <br />Category 5 - Groundwater <br />• ii • <br />Yield <br />Capitalized Costs <br />20 -year Average Annual Values (ac- ft/yr) <br />Cost per Acre -Foot of <br />Net Hydrologic <br />Net Hydrologic Effect <br />Net Hydrologic Effect <br />Reduction to Target Flow <br />Cost* <br />Cost* <br />Average Reduction in Target Flow <br />Effect <br />at Top of Downstream Reach <br />at Habitat <br />Shortages at Habitat <br />w/ diversion loss <br />w /out diversion loss <br />Shortage At Habitat $ /ac -fl <br />(w/diversion loss <br />w/o diversion loss <br />(w/diversion loss <br />w/o diversion loss <br />(w/diversion loss <br />w/o diversion loss <br />w /diversion loss <br />w/o diversion loss <br />Alternative <br />At Site <br />$ Million <br />$ Million <br />REGION t <br />Reach 5 <br />Pratt Ferris- GW Recharge Project <br />(136) <br />(136) <br />(136) <br />(358) <br />(35) <br />109 <br />278 <br />$0.1 <br />$0.1 <br />$930 <br />$360 <br />Reach 5 <br />GW Recharge Project(SDF =60 Days) <br />(1,511) <br />(1,946) <br />(1,476) <br />(3,771) <br />(344) <br />1,577 <br />3,617 <br />$9.6 <br />$9.6 <br />$6,090 <br />$2,650 <br />GW Recharge Project (SDF =120 Days) <br />(2,109) <br />(2,661) <br />(2,066) <br />(4,906) <br />(735) <br />1,772 <br />4,307 <br />$9.6 <br />$9.6 <br />$5,420 <br />$2,230 <br />GW Recharge Project(SDF =270 Days) <br />(3,097) <br />(3,759) <br />(3,047) <br />(6,294) <br />(1,555) <br />1,812 <br />4,836 <br />$9.6 <br />$9.6 <br />$5,300 <br />$1,990 <br />REGION 2 <br />Reach 7 <br />GW Recharge Project(SDF =60 Days) <br />(3,679) <br />(4,620) <br />(2,543) <br />(3,438) <br />6,542 <br />1,032 <br />9,524 <br />$10.7 <br />$19.6 <br />$10,370 <br />$2,060 <br />GW Recharge Project(SDF =120 Days) <br />(5,144) <br />(6,352) <br />(3,828) <br />(4,509) <br />7,108 <br />1,108 <br />11,002 <br />$10.7 <br />$19.6 <br />$9,660 <br />$1,780 <br />GW Recharge Project(SDF =270 Days) <br />(7,573) <br />(9,015) <br />(6,138) <br />(5,892) <br />6,529 <br />1,021 <br />11,684 <br />$10.7 <br />$19.6 <br />$10,480 <br />$1,680 <br />GW Recharge Project(SDF =300 Days) <br />(3,961) <br />(4,474) <br />(2,792) <br />(2,809) <br />4,757 <br />438 <br />5,520 <br />$2.1 <br />$11.0 <br />$4,790 <br />$1,990 <br />Beebe Draw (Above Reach 7) <br />(808) <br />(808) <br />(808) <br />(8,656) <br />10,381 <br />1,258 <br />19,666 <br />$10.9 <br />$19.8 <br />$8,660 <br />$1,010 <br />Reach 8 <br />GW Recharge Project(SDF =60 Days) <br />(3,679) <br />(4,087) <br />495 <br />(4,521) <br />4,415 <br />2,068 <br />9,573 <br />$10.7 <br />$17.3 <br />$5,170 <br />$1,810 <br />GW Recharge Project (SDF= 120 Days) <br />(5,144) <br />(5,529) <br />(174) <br />(5,949) <br />4,532 <br />2,253 <br />11,062 <br />$10.7 <br />$17.3 <br />$4,750 <br />$1,560 <br />GW Recharge Project(SDF =270 Days) <br />(7,573) <br />(7,706) <br />(1,944) <br />(7,813) <br />3,524 <br />2,137 <br />11,751 <br />$10.7 <br />$17.3 <br />$5,010 <br />$1,470 <br />GW Recharge Project(SDF =300 Days) <br />(3,961) <br />(3,938) <br />(459) <br />(3,774) <br />2,867 <br />902 <br />5,556 <br />$2.1 <br />$8.7 <br />$2,330 <br />$1,570 <br />Badger Beaver Recharge Project <br />(13,297) <br />(11,966) <br />(10,854) <br />(7,831) <br />(4,238) <br />655 <br />3,427 <br />$14.0 <br />$20.0 <br />$21,370 <br />$5,840 <br />Reach 9 (Sites in the middle of the reach) <br />GW Recharge Project(SDF =60 Days) <br />(3,679) <br />(5,737) <br />(2,440) <br />(5,314) <br />1,868 <br />3,731 <br />9,961 <br />$10.7 <br />$14.6 <br />$2,870 <br />$1,470 <br />GW Recharge Project (SDF= 120 Days) <br />(5,144) <br />(7,675) <br />(3,704) <br />(7,048) <br />1,461 <br />4,121 <br />11,167 <br />$10.7 <br />$14.6 <br />$2,600 <br />$1,310 <br />GW Recharge Project(SDF =270 Days) <br />(7,573) <br />(10,458) <br />(5,992) <br />(9,383) <br />(35) <br />4,040 <br />11,870 <br />$10.7 <br />$14.6 <br />$2,650 <br />$1,230 <br />GW Recharge Project(SDF= 300 Days) <br />(3,961) <br />(4,913) <br />(2,552) <br />(4,856) <br />463 <br />1,757 <br />5,620 <br />$2.1 <br />$6.1 <br />$1,200 <br />$1,090 <br />Reach 9 (Sites at the bottom of the reach) <br />GW Recharge Project(SDF =60 Days) <br />(3,679) <br />(3,679) <br />(3,679) <br />(5,167) <br />1,273 <br />4,410 <br />9,720 <br />$10.7 <br />$10.7 <br />$2,430 <br />$1,100 <br />GW Recharge Project(SDF =120 Days) <br />(5,144) <br />(5,144) <br />(5,144) <br />(6,880) <br />760 <br />4,922 <br />11,238 <br />$10.7 <br />$10.7 <br />$2,170 <br />$950 <br />GW Recharge Project(SDF =270 Days) <br />(7,573) <br />(7,573) <br />(7,573) <br />(9,231) <br />(825) <br />4,917 <br />11,950 <br />$10.7 <br />$10.7 <br />$2,180 <br />$900 <br />• ii • <br />