TABLE 8.G.79
<br />Alternatives Yield and Cost by Reach
<br />Category 5 - Groundwater
<br />• ii •
<br />Yield
<br />Capitalized Costs
<br />20 -year Average Annual Values (ac- ft/yr)
<br />Cost per Acre -Foot of
<br />Net Hydrologic
<br />Net Hydrologic Effect
<br />Net Hydrologic Effect
<br />Reduction to Target Flow
<br />Cost*
<br />Cost*
<br />Average Reduction in Target Flow
<br />Effect
<br />at Top of Downstream Reach
<br />at Habitat
<br />Shortages at Habitat
<br />w/ diversion loss
<br />w /out diversion loss
<br />Shortage At Habitat $ /ac -fl
<br />(w/diversion loss
<br />w/o diversion loss
<br />(w/diversion loss
<br />w/o diversion loss
<br />(w/diversion loss
<br />w/o diversion loss
<br />w /diversion loss
<br />w/o diversion loss
<br />Alternative
<br />At Site
<br />$ Million
<br />$ Million
<br />REGION t
<br />Reach 5
<br />Pratt Ferris- GW Recharge Project
<br />(136)
<br />(136)
<br />(136)
<br />(358)
<br />(35)
<br />109
<br />278
<br />$0.1
<br />$0.1
<br />$930
<br />$360
<br />Reach 5
<br />GW Recharge Project(SDF =60 Days)
<br />(1,511)
<br />(1,946)
<br />(1,476)
<br />(3,771)
<br />(344)
<br />1,577
<br />3,617
<br />$9.6
<br />$9.6
<br />$6,090
<br />$2,650
<br />GW Recharge Project (SDF =120 Days)
<br />(2,109)
<br />(2,661)
<br />(2,066)
<br />(4,906)
<br />(735)
<br />1,772
<br />4,307
<br />$9.6
<br />$9.6
<br />$5,420
<br />$2,230
<br />GW Recharge Project(SDF =270 Days)
<br />(3,097)
<br />(3,759)
<br />(3,047)
<br />(6,294)
<br />(1,555)
<br />1,812
<br />4,836
<br />$9.6
<br />$9.6
<br />$5,300
<br />$1,990
<br />REGION 2
<br />Reach 7
<br />GW Recharge Project(SDF =60 Days)
<br />(3,679)
<br />(4,620)
<br />(2,543)
<br />(3,438)
<br />6,542
<br />1,032
<br />9,524
<br />$10.7
<br />$19.6
<br />$10,370
<br />$2,060
<br />GW Recharge Project(SDF =120 Days)
<br />(5,144)
<br />(6,352)
<br />(3,828)
<br />(4,509)
<br />7,108
<br />1,108
<br />11,002
<br />$10.7
<br />$19.6
<br />$9,660
<br />$1,780
<br />GW Recharge Project(SDF =270 Days)
<br />(7,573)
<br />(9,015)
<br />(6,138)
<br />(5,892)
<br />6,529
<br />1,021
<br />11,684
<br />$10.7
<br />$19.6
<br />$10,480
<br />$1,680
<br />GW Recharge Project(SDF =300 Days)
<br />(3,961)
<br />(4,474)
<br />(2,792)
<br />(2,809)
<br />4,757
<br />438
<br />5,520
<br />$2.1
<br />$11.0
<br />$4,790
<br />$1,990
<br />Beebe Draw (Above Reach 7)
<br />(808)
<br />(808)
<br />(808)
<br />(8,656)
<br />10,381
<br />1,258
<br />19,666
<br />$10.9
<br />$19.8
<br />$8,660
<br />$1,010
<br />Reach 8
<br />GW Recharge Project(SDF =60 Days)
<br />(3,679)
<br />(4,087)
<br />495
<br />(4,521)
<br />4,415
<br />2,068
<br />9,573
<br />$10.7
<br />$17.3
<br />$5,170
<br />$1,810
<br />GW Recharge Project (SDF= 120 Days)
<br />(5,144)
<br />(5,529)
<br />(174)
<br />(5,949)
<br />4,532
<br />2,253
<br />11,062
<br />$10.7
<br />$17.3
<br />$4,750
<br />$1,560
<br />GW Recharge Project(SDF =270 Days)
<br />(7,573)
<br />(7,706)
<br />(1,944)
<br />(7,813)
<br />3,524
<br />2,137
<br />11,751
<br />$10.7
<br />$17.3
<br />$5,010
<br />$1,470
<br />GW Recharge Project(SDF =300 Days)
<br />(3,961)
<br />(3,938)
<br />(459)
<br />(3,774)
<br />2,867
<br />902
<br />5,556
<br />$2.1
<br />$8.7
<br />$2,330
<br />$1,570
<br />Badger Beaver Recharge Project
<br />(13,297)
<br />(11,966)
<br />(10,854)
<br />(7,831)
<br />(4,238)
<br />655
<br />3,427
<br />$14.0
<br />$20.0
<br />$21,370
<br />$5,840
<br />Reach 9 (Sites in the middle of the reach)
<br />GW Recharge Project(SDF =60 Days)
<br />(3,679)
<br />(5,737)
<br />(2,440)
<br />(5,314)
<br />1,868
<br />3,731
<br />9,961
<br />$10.7
<br />$14.6
<br />$2,870
<br />$1,470
<br />GW Recharge Project (SDF= 120 Days)
<br />(5,144)
<br />(7,675)
<br />(3,704)
<br />(7,048)
<br />1,461
<br />4,121
<br />11,167
<br />$10.7
<br />$14.6
<br />$2,600
<br />$1,310
<br />GW Recharge Project(SDF =270 Days)
<br />(7,573)
<br />(10,458)
<br />(5,992)
<br />(9,383)
<br />(35)
<br />4,040
<br />11,870
<br />$10.7
<br />$14.6
<br />$2,650
<br />$1,230
<br />GW Recharge Project(SDF= 300 Days)
<br />(3,961)
<br />(4,913)
<br />(2,552)
<br />(4,856)
<br />463
<br />1,757
<br />5,620
<br />$2.1
<br />$6.1
<br />$1,200
<br />$1,090
<br />Reach 9 (Sites at the bottom of the reach)
<br />GW Recharge Project(SDF =60 Days)
<br />(3,679)
<br />(3,679)
<br />(3,679)
<br />(5,167)
<br />1,273
<br />4,410
<br />9,720
<br />$10.7
<br />$10.7
<br />$2,430
<br />$1,100
<br />GW Recharge Project(SDF =120 Days)
<br />(5,144)
<br />(5,144)
<br />(5,144)
<br />(6,880)
<br />760
<br />4,922
<br />11,238
<br />$10.7
<br />$10.7
<br />$2,170
<br />$950
<br />GW Recharge Project(SDF =270 Days)
<br />(7,573)
<br />(7,573)
<br />(7,573)
<br />(9,231)
<br />(825)
<br />4,917
<br />11,950
<br />$10.7
<br />$10.7
<br />$2,180
<br />$900
<br />• ii •
<br />
|