Laserfiche WebLink
TABLE 8.G.78 <br />COST SUMMARY <br />Re- regulation Opportunities and Reductions in Natural Groundwater Exports From the Basin <br />Note: It was assumed that wells and pumping hardware would need to be replaced after 15 years. Future costs are based on an rate of 4 percent and a present day cost of $30,000. <br />8 -G -77 <br />REGION <br />3 <br />Reaches <br />Reaches <br />Reaches <br />Reaches <br />Reaches <br />Reach 10 <br />Reach 17 <br />18 and 19 <br />Reach 10 <br />Reach 17 <br />18 and 19 <br />Reach 10 <br />Reach 17 <br />18 and 19 <br />17, 18 and 19 <br />17, 18 and 19 <br />Scenario 1 <br />Scenario 2 <br />Scenario 3 <br />Scenario 4 <br />Scenario 5 <br />CONSTRUCTION COSTS PER WELL <br />Subsurface Investigations <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />3,500 <br />Well Construction & Pumps <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />30,000 <br />Conveyance Conduit <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />7,000 <br />Power Hook -up <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4,000 <br />4000' 12" dia pipe @ $5 1ft <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />20,000 <br />Replacement Costs (Well & Pump Hardware) <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />54,000 <br />Total Cost per Well <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />118,500 <br />No. of wells <br />80 <br />112 <br />64 <br />80 <br />112 <br />64 <br />80 <br />112 <br />64 <br />37 <br />129 <br />Total Construction Cost <br />9,480,000 <br />13,272,000 <br />7,584,000 <br />9,480,000 <br />13,272,000 <br />7,584,000 <br />9,480,000 <br />13,272,000 <br />79584,000 <br />4,384,500 <br />15,286,500 <br />Engineering Fees (10 %) <br />948,000 <br />1,327,000 <br />758,000 <br />948,000 <br />1,327,000 <br />758,000 <br />948,000 <br />1,327,000 <br />758,000 <br />438,000 <br />1,529,000 <br />Construction Costs + Engineering Fees <br />10,428,000 <br />14,5999000 <br />8,342,000 <br />10,428,000 <br />14,599,000 <br />8,342,000 <br />10,428,000 <br />14,599,000 <br />8,342,000 <br />4,822,500 <br />16,815,500 <br />ANNUAL COSTS <br />Amt. Diverted <br />44,100 <br />45,300 <br />42,700 <br />32,700 <br />33,700 <br />32,200 <br />14,300 <br />14,500 <br />14,200 <br />14,500 <br />51,000 <br />Pump operation cost ($8 /af) <br />352,320 <br />376,160 <br />337,040 <br />260,800 <br />268,560 <br />253,680 <br />114,160 <br />115,680 <br />111,920 <br />115,280 <br />115,280 <br />Annual Maintenance Costs ($300 /well) <br />24,000 <br />33,600 <br />19,200 <br />24,000 <br />33,600 <br />19,200 <br />24,000 <br />33,600 <br />19,200 <br />11,100 <br />11,100 <br />Total Annual Cost <br />420,420 <br />455,060 <br />398,940 <br />317,500 <br />335,860 <br />305,080 <br />152,460 <br />163,780 <br />145,320 <br />140,880 <br />177,380 <br />No. of years <br />20 <br />20 <br />20 <br />20 <br />20 <br />20 <br />20 <br />20 <br />20 <br />20 <br />20 <br />Rate <br />6% <br />6% <br />6% <br />6% <br />6% <br />6% <br />6% <br />6% <br />6% <br />6% <br />6% <br />Present Value of Annual Costs <br />4,822,184 <br />5,219,502 <br />4,575,810 <br />3,641,700 <br />3,8529288 <br />3,499,244 <br />1,748,704 <br />1,8789544 <br />1,666,809 <br />1,615,883 <br />29034,535 <br />Total Capitalized Cost of Project <br />1 15,260,000 <br />19,820,000 <br />12,920,000 <br />1 14,070,000 <br />18,460,000 <br />11,850,000 <br />1 12,180,000 <br />16,480,000 <br />10,010,000 <br />1 6,440,000 <br />1 18,860,000 <br />Note: It was assumed that wells and pumping hardware would need to be replaced after 15 years. Future costs are based on an rate of 4 percent and a present day cost of $30,000. <br />8 -G -77 <br />