|
TABLE 8.G.78
<br />COST SUMMARY
<br />Re- regulation Opportunities and Reductions in Natural Groundwater Exports From the Basin
<br />Note: It was assumed that wells and pumping hardware would need to be replaced after 15 years. Future costs are based on an rate of 4 percent and a present day cost of $30,000.
<br />8 -G -77
<br />REGION
<br />3
<br />Reaches
<br />Reaches
<br />Reaches
<br />Reaches
<br />Reaches
<br />Reach 10
<br />Reach 17
<br />18 and 19
<br />Reach 10
<br />Reach 17
<br />18 and 19
<br />Reach 10
<br />Reach 17
<br />18 and 19
<br />17, 18 and 19
<br />17, 18 and 19
<br />Scenario 1
<br />Scenario 2
<br />Scenario 3
<br />Scenario 4
<br />Scenario 5
<br />CONSTRUCTION COSTS PER WELL
<br />Subsurface Investigations
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />3,500
<br />Well Construction & Pumps
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />30,000
<br />Conveyance Conduit
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />7,000
<br />Power Hook -up
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4,000
<br />4000' 12" dia pipe @ $5 1ft
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />20,000
<br />Replacement Costs (Well & Pump Hardware)
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />54,000
<br />Total Cost per Well
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />118,500
<br />No. of wells
<br />80
<br />112
<br />64
<br />80
<br />112
<br />64
<br />80
<br />112
<br />64
<br />37
<br />129
<br />Total Construction Cost
<br />9,480,000
<br />13,272,000
<br />7,584,000
<br />9,480,000
<br />13,272,000
<br />7,584,000
<br />9,480,000
<br />13,272,000
<br />79584,000
<br />4,384,500
<br />15,286,500
<br />Engineering Fees (10 %)
<br />948,000
<br />1,327,000
<br />758,000
<br />948,000
<br />1,327,000
<br />758,000
<br />948,000
<br />1,327,000
<br />758,000
<br />438,000
<br />1,529,000
<br />Construction Costs + Engineering Fees
<br />10,428,000
<br />14,5999000
<br />8,342,000
<br />10,428,000
<br />14,599,000
<br />8,342,000
<br />10,428,000
<br />14,599,000
<br />8,342,000
<br />4,822,500
<br />16,815,500
<br />ANNUAL COSTS
<br />Amt. Diverted
<br />44,100
<br />45,300
<br />42,700
<br />32,700
<br />33,700
<br />32,200
<br />14,300
<br />14,500
<br />14,200
<br />14,500
<br />51,000
<br />Pump operation cost ($8 /af)
<br />352,320
<br />376,160
<br />337,040
<br />260,800
<br />268,560
<br />253,680
<br />114,160
<br />115,680
<br />111,920
<br />115,280
<br />115,280
<br />Annual Maintenance Costs ($300 /well)
<br />24,000
<br />33,600
<br />19,200
<br />24,000
<br />33,600
<br />19,200
<br />24,000
<br />33,600
<br />19,200
<br />11,100
<br />11,100
<br />Total Annual Cost
<br />420,420
<br />455,060
<br />398,940
<br />317,500
<br />335,860
<br />305,080
<br />152,460
<br />163,780
<br />145,320
<br />140,880
<br />177,380
<br />No. of years
<br />20
<br />20
<br />20
<br />20
<br />20
<br />20
<br />20
<br />20
<br />20
<br />20
<br />20
<br />Rate
<br />6%
<br />6%
<br />6%
<br />6%
<br />6%
<br />6%
<br />6%
<br />6%
<br />6%
<br />6%
<br />6%
<br />Present Value of Annual Costs
<br />4,822,184
<br />5,219,502
<br />4,575,810
<br />3,641,700
<br />3,8529288
<br />3,499,244
<br />1,748,704
<br />1,8789544
<br />1,666,809
<br />1,615,883
<br />29034,535
<br />Total Capitalized Cost of Project
<br />1 15,260,000
<br />19,820,000
<br />12,920,000
<br />1 14,070,000
<br />18,460,000
<br />11,850,000
<br />1 12,180,000
<br />16,480,000
<br />10,010,000
<br />1 6,440,000
<br />1 18,860,000
<br />Note: It was assumed that wells and pumping hardware would need to be replaced after 15 years. Future costs are based on an rate of 4 percent and a present day cost of $30,000.
<br />8 -G -77
<br />
|