Laserfiche WebLink
TABLE 8.G.79 (cont.) <br />Alternatives Yield and Cost by Reach <br />Category 5 - Groundwater <br />Yrmmt vame or sum or unplernentanon cost, capital costs and operating costs over 2U year period using 6 percent discount rate. <br />Legend: <br />Scenario 1 : Pump from the groundwater mound up to 51,000 ac -fVyr and discharge directly to the Platte River. <br />Scenario 2 : Pump from the groundwater mound up to 36,500 ac -ft/yr and discharge directly to the Platte River. <br />Scenario 3 : Pump from the groundwater mound up to 14,500 ac -ft/yr and discharge directly to the Platte River. <br />Scenario 4 : Purp from the groundwater mound up to 14,500 ac -tVyr for irrigation of lands previously irrigated by surface water. <br />Scenario 5 : Punp from the groundwater mound up to 51,000 ac -ft/yr for irrigation of lands previously irrigated by surface water. <br />8 -G -79 <br />Yield <br />Capitalized Costs <br />20 -year Average Annual Values (ac -fUyr) <br />Cost per Acre -Foot of <br />Net Hydrologic <br />Net Hydrologic Effect <br />Net Hydrologic Effect <br />Reduction to Target Flow <br />Cost' <br />Cost- <br />Average Reduction in Target Flow <br />Effect <br />at Top of Downstream Reach <br />at Habitat <br />Shortages at Habitat <br />w/ diversion loss <br />w /out diversion loss <br />Shortage At Habitat $ /ac -ft <br />Altemative <br />At Site <br />(w/diversion loss <br />w/o diversion loss <br />(w/diversion loss <br />w/o diversion loss <br />w /diversion loss <br />w/o diversion loss <br />$ Million <br />$ Million <br />w /diversion loss <br />w/o diversion loss <br />REGION 3 <br />Reach 10 <br />GW Recharge Project(SDF =60 Days) <br />(3,387) <br />(3,417) <br />(2,339) <br />(5,119) <br />(60) <br />3,935 <br />7,942 <br />$10.2 <br />$10.2 <br />$2,590 <br />$1,280 <br />GW Recharge Project(SDF =120 Days) <br />(4,720) <br />(4,759) <br />(3,484) <br />(6,783) <br />(734) <br />4,430 <br />9,256 <br />$10.2 <br />$10.2 <br />$2,300 <br />$1,100 <br />GW Recharge Project(SDF =270 Days) <br />(6,931) <br />(6,956) <br />(5,557) <br />(9,047) <br />(2,321) <br />4,511 <br />9,987 <br />$10.2 <br />$10.2 <br />$2,260 <br />$1,020 <br />GW Reregulation Opportuni ties - Scenario) <br />44,066 <br />42,883 <br />43,965 <br />16,907 <br />36,031 <br />16,907 <br />36,031 <br />$15.3 <br />$15.3 <br />$900 <br />$420 <br />GW Reregulation Opportunities - Scenario2 <br />32,672 <br />31,812 <br />32,596 <br />12,656 <br />26,775 <br />12,656 <br />26,775 <br />$14.1 <br />$14.1 <br />$1,110 <br />$530 <br />GW Retegulation Opportunities - Scenario3 <br />14,300 <br />13,941 <br />14,266 <br />5,671 <br />11,765 <br />5,671 <br />11,765 <br />$12.2 <br />$12.2 <br />$2,150 <br />$1,040 <br />Reach 13 <br />GW Recharge Project(SDF =60 Days) <br />(2,896) <br />(2,931) <br />(3,168) <br />(5,573) <br />(510) <br />3,884 <br />7,467 <br />$9.7 <br />$9.7 <br />$2,500 <br />$1,300 <br />GW Recharge Project (SDF= 120 Days) <br />(4,011) <br />(4,055) <br />(4,366) <br />(7,368) <br />(1,171) <br />4,257 <br />8,648 <br />$9.7 <br />$9.7 <br />$2,280 <br />$1,120 <br />GW Recharge Project(SDF =270 Days) <br />(5,841) <br />(5,892) <br />(6,282) <br />(9,702) <br />(2,623) <br />4,115 <br />9,196 <br />$9.7 <br />$9.7 <br />$2,360 <br />$1,050 <br />GW Recharge Project(SDF =300 Days) <br />(2,131) <br />(2,134) <br />(2,277) <br />(3,975) <br />(1,184) <br />1,137 <br />2,829 <br />$2.1 <br />$2.1 <br />$1,850 <br />$740 <br />Reach 16 <br />Gothenburg Canal -GW Recharge Project <br />(3,143) <br />(3,143) <br />(3,143) <br />(3,496) <br />(2,936) <br />667 <br />1,097 <br />$0.7 <br />$0.7 <br />$1,050 <br />$640 <br />Reach 17 <br />Dawson Canal -GW Recharge Project <br />(4,288) <br />(4,288) <br />(4,288) <br />(4,087) <br />(4,027) <br />1,462 <br />1,510 <br />$0.9 <br />$0.9 <br />$620 <br />$600 <br />GW Reregulation Opportunities - Scenario) <br />45,271 <br />45,136 <br />45,136 <br />36,521 <br />37,895 <br />36,521 <br />37,895 <br />$19.8 <br />$19.8 <br />$540 <br />$520 <br />GW Reregulation Opportunities - Scenario2 <br />33,671 <br />33,572 <br />33,572 <br />27,216 <br />28,210 <br />27,216 <br />28,210 <br />$18.5 <br />$18.5 <br />$680 <br />$660 <br />GW Reregulation Opportunities - Scenario 3 <br />14,500 <br />14,459 <br />14,459 <br />11,767 <br />12,175 <br />11,767 <br />12,175 <br />$16.5 <br />$16.5 <br />$1,400 <br />$1,360 <br />GW Reregulation Opportunities - Scenario 4 <br />14,500 <br />14,456 <br />14,456 <br />13,461 <br />13,734 <br />8,964 <br />9,221 <br />$6.4 <br />$6.4 <br />$710 <br />$690 <br />GW Reregulation Opportunities - Scenarios <br />51,000 <br />50,844 <br />50,844 <br />47,346 <br />48,306 <br />30,003 <br />30,851 <br />$18.9 <br />$18.9 <br />$630 <br />$610 <br />Reach 18 <br />GW Reregulation Opportunities - Scenario) <br />42,738 <br />37,929 <br />42,126 <br />33,071 <br />36,395 <br />33,071 <br />36,395 <br />$12.9 <br />$12.9 <br />$390 <br />$350 <br />GW Reregulation Opportunities - Scenario 2 <br />32,169 <br />28,558 <br />31,706 <br />24,966 <br />27,467 <br />24,966 <br />27,467 <br />$11.9 <br />$11.9 <br />$480 <br />$430 <br />GW Reregulation Opportunities - scenario 3 <br />14,200 <br />12,653 <br />13,986 <br />11,115 <br />12,173 <br />11,115 <br />12,173 <br />$10.0 <br />$10.0 <br />$900 <br />$820 <br />GW Reregulation Opportunities - Scenario4 <br />14,500 <br />13,783 <br />14,407 <br />13,271 <br />13,865 <br />8,773 <br />9,315 <br />$6.4 <br />$6.4 <br />$730 <br />$690 <br />GW Reregulation Opportunities - Scenarios <br />51,000 <br />48,478 <br />50,673 <br />46,677 <br />48,766 <br />29,296 <br />31,129 <br />$18.9 <br />$18.9 <br />$650 <br />$610 <br />Reach 19 <br />GW Reregulation Opportunities - Scenario) <br />42,738 <br />37,754 <br />37,754 <br />37,754 <br />37,754 <br />37,754 <br />37,754 <br />$12.9 <br />$12.9 <br />$340 <br />$340 <br />GW Reregulation Opportunities - Scenario 2 <br />32,169 <br />28,483 <br />28,483 <br />28,483 <br />28,483 <br />28,483 <br />28,483 <br />$11.9 <br />$11.9 <br />$420 <br />$420 <br />GW Reregulation Opportunities - Scenario 3 <br />14,200 <br />12,624 <br />12,624 <br />12,624 <br />12,624 <br />12,624 <br />12,624 <br />$10.0 <br />$10.0 <br />$790 <br />$790 <br />GW Reregulation Opportunities - Scenario 4 <br />14,500 <br />14,033 <br />14,033 <br />14,033 <br />14,033 <br />9,440 <br />9,440 <br />$6.4 <br />$6.4 <br />$680 <br />$680 <br />GW Rere lation Opportunities - scenario 5 <br />51,000 <br />49,357 <br />49,357 <br />49,357 <br />49,357 <br />31,512 <br />31,512 <br />$18.9 <br />$18.9 <br />$600 <br />$600 <br />Yrmmt vame or sum or unplernentanon cost, capital costs and operating costs over 2U year period using 6 percent discount rate. <br />Legend: <br />Scenario 1 : Pump from the groundwater mound up to 51,000 ac -fVyr and discharge directly to the Platte River. <br />Scenario 2 : Pump from the groundwater mound up to 36,500 ac -ft/yr and discharge directly to the Platte River. <br />Scenario 3 : Pump from the groundwater mound up to 14,500 ac -ft/yr and discharge directly to the Platte River. <br />Scenario 4 : Purp from the groundwater mound up to 14,500 ac -tVyr for irrigation of lands previously irrigated by surface water. <br />Scenario 5 : Punp from the groundwater mound up to 51,000 ac -ft/yr for irrigation of lands previously irrigated by surface water. <br />8 -G -79 <br />