My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PRRIP Water Advisory Committee Meeting Notes
CWCB
>
Water Supply Protection
>
DayForward
>
5001-6000
>
PRRIP Water Advisory Committee Meeting Notes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2013 1:00:44 PM
Creation date
1/15/2013 1:00:14 PM
Metadata
Fields
Template:
Water Supply Protection
Description
Platte River Recovery Implementation Program (PRRIP) November 12-13, 2008 Water Advisory Committee (WAC) Meeting Packet including minutes, documents, schedule, etc.
State
CO
NE
WY
Basin
South Platte
Water Division
1
Date
11/12/2008
Author
Platte River Recovery Implementation Program (PRRIP)
Title
Platte River Recovery Implementation Program (PRRIP) November 12-13, 2008 Water Advisory Committee (WAC) Meeting Packet
Water Supply Pro - Doc Type
Meeting
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
189
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Platte River Recovery Implementation Project <br />Field Investigation Checklist <br />General Site Features Comments / Notes <br />General Site Description • Jeffrey Canyon Res confined by the surrounding topography <br />(waterways, topography, etc.) (approx surface area = 290 ac) <br />On/Off Channel <br />* Off channel u/s Platte Rivet, <br />Site Access (Roads) * 4WD dirt road in canyon would need to be relocated. Proposed <br />Access road = 3.6 miles. <br />• Access road not located. Roads off S. Jeffrey Rd appeared to be <br />private access only. <br />Fig 1: View of landscape from S. Jeffrey Road <br />Fig 2: View of potential dam site from S. Jeffrey Road <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.