Laserfiche WebLink
n <br />Platte River Recovery Implementation Project <br />' Field Investigation Checklist <br />"Visit Attendees <br />Jerry Kenny, Cory Stienke, Justin Brei, Blaine Dwyer, Jeff <br />Bandy, Jenn Chipman <br />Bate of Visit <br />.m.............. .____ ......................... W.. .. .... ............. _ . . . ........... . <br />9/2/08 <br />Dar 1., 1." site <br />Site Name <br />Jeffrey Canyon <br />Location <br />Adjacent to Jeffrey Reservoir <br />Estimated Capacity <br />10,400 acre -feet <br />Conveyance In (supply) <br />Jeffrey Reservoir via pipeline, pump, and/or potential channel <br />Conveyance Out (return) <br />New Return either to Plate river or tie -in to Jeffrey Return <br />Supply Canal <br />Dana Type <br />Assumed Embankment (Platte, 1999) <br />.... _---______._ ........................_ .._....._...... _.._.........._� <br />Dam Height <br />_ - ...._........_._.._ .�...._ .............. _ ..... _.. __ ...... _ ......... _. <br />30 feet <br />Crest Length <br />1030 feet NT <br />Estimated NWSF.. L <br />2,800 ft <br />{general Project <br />Description. <br />• This reservoir would be located in Jeffrey Canyon (a right bank <br />tributary to the Matte), to the southeast of Jeffrey reservoir. <br />Deliveries to Jeffrey Canyon Reservoir would be from Jeffrey <br />Reservoir via pipeline (6,400 ft long, 36" dia) and pump (used to <br />overcome headloss from iJS -283 tunnel. The reservoir would <br />release to the Platte River downstream of Brady. (FII;}R, 2000) <br />• Basin Area = 2,089 acres <br />Surface Area = 524 acres <br />Volume = 10,390 of (Vol/SA ratio = 19.8 ft) <br />