My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153495 PIF Contract
CWCB
>
Loan Projects
>
DayForward
>
3001-4000
>
C153495 PIF Contract
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2012 1:59:12 PM
Creation date
12/6/2012 1:50:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153495
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
SB 89-85
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Task 2 - Collect and Review Data <br />The first activity of the MKE project team shall be to make a search for and <br />complete a list of all available data on the Barnes Meadow Reservoir Dam. A <br />thorough review shall be made of that data including examination of <br />construction drawings and records, maintenance records, special investigation <br />reports, and other existing data on file in the City's and the State <br />Engineer's records. This information shall be supplemented with broader <br />regional information such as geological mapping, streamflow records, National <br />Atmospheric and Oceanic Administration (NOAA) publications, and other <br />published material. <br />This task shall include site visits by the technical personnel assigned to <br />work on this Contract. An expanded checklist, similar in nature to that used <br />in Phase I inspection investigations by the State Engineer, shall be employed <br />to assure the comprehensiveness of the site inspection. Survey confirmation <br />measurements and a photographic recor 1 also be an important part of <br />these inspections. <br />The activities of this task shall oe ? t as early as possible after <br />receiving notice to proceed. <br />Task 3 - CHAPTER I, General Information <br />General information regarding the project shall be gathered by the MKE project <br />team, from available records on file at the City, State Engineer's Office and <br />at any other location. From this information, a project map shall be <br />prepared. The project map shall be a topographic map that illustrates the <br />proposed project and shows the location of the existing and proposed project <br />features with respect to source of water supply, counties, and nearest cities <br />and towns, including Greeley. In addition, climatic information shall be <br />gathered and presented as part of this task to include average monthly <br />temperatures, maximum and minimum temperatures of record, length of frost -free <br />periods, average monthly precipitation, and information regarding wind, hail, <br />or any other damaging climatological factors representative of the project <br />area and Greeley. The General Information shall include reports by any <br />interested agencies such as the U.S. Forest Service or Water Conservation <br />Districts regarding the dam. <br />- 2 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.