Laserfiche WebLink
D <br />EXHIBIT A <br />CITY OF GREELEY <br />FEASIBILITY STUDY FOR REHABILITATION OF V ��`9�•y <br />BARNES MEADOW RESERVOIR DAM coNs��`,�ao y, <br />gTjoN��R <br />SCOPE OF SERVICES 4 <br />GENERAL <br />A feasibility study and report shall be prepared for the Rehabilitation of <br />Barnes Meadow Reservoir Dam. At the request of the Colorado Water <br />Conservation Board, Tasks 3 through 11 of the scope of services have been <br />formatted in accordance with the CWCB outline for feasibility study reports as <br />shown in the CWCB Guidelines. <br />The feasibility report shall be prefaced by the following information, most of <br />which will be generated by work performed under Task 2. <br />- Title Page �. <br />- Letter of Transmittal+��a " "� <br />- Resolution of Applying Organiz n <br />- Table of Contents <br />- Lists of Maps and Exhibits,``� <br />- List of References <br />- Project Summary <br />- Conclusions and Recommendations <br />Task 1 - Project Procedures Manual <br />Prior to starting any work on this Contract, the Project Manager shall prepare <br />a Project Procedures Manual in accordance with MKE policy. The procedures <br />manual shall describe the work program, project organization, communications, <br />administration and accounting. A copy of the procedures manual shall be made <br />available to the City and the Colorado Water Conservation Board for reference. <br />VVWTnTT A <br />(Feasibility Report Contract) <br />